Most manufacturers said 45 days was impossible. Atlas did it in 45 days.
A highway contractor near Gandhinagar needed a 160 TPH asphalt batch mix plant — with a natural gas burner — operational within 45 days. Every other manufacturer they evaluated, including Ammann Apollo, quoted 90 to 120 days.
Atlas Technologies committed to 45 days. And delivered.
Here is how it was done:
Parallel manufacturing — assembly and production ran simultaneously instead of sequentially, cutting weeks off the standard timeline.
Pre-coordinated logistics — transportation and site preparation were planned in advance so no time was lost between phases.
Dedicated project team — one team owned the entire project from order to commissioning, eliminating gaps from handoffs.
Accelerated commissioning — systematic verification of all systems meant the plant was tested, tuned, and production-ready at day 45, not day 90.
The contractor's own words: "Atlas committed to the timeline and delivered. We began our project operations on schedule."
Full case study — how the specs were selected, why natural gas, what the 45-day execution actually looked like, and what contractors can learn from it — is here:
atlastechnologiesindia.com/blog/160-tph-asphalt-batch-mix-plant-gandhinagar-case-study