Rahughat Hydropower Project: Tunnel Structure Ready, 92% Physical Progress Achieved
Myagdi: The construction of the main structures inside the tunnel under the 40-megawatt Rahughat Hydropower Project being built in Myagdi has been completed. This project, being developed by Raghuganga Hydropower Limited, a subsidiary of the Nepal Electricity Authority, is located on the border of wards 4 and 5 of Raghuganga Rural Municipality. The construction of the main tunnel connecting the…













