The Everett Clinic Smokey Point Medical Center, Marysville, WA
Scope of work: Moisture mitigation, slab remediation & slab leveling
Project size: 42,500 sq ft
General Contractor: JR Abbott
Architect: ZGF
ABW were brought on board to address a number of issues on this project. On the first floor there was a rain out that need to be repaired, along with some deflection in the slab on metal deck. Along with these issues a moisture problem was uncovered and needed to be resolved. We installed a 100% solid epoxy and poured High Tech Cement MB 10 self leveling underlayment, via pour pump truck, in 5 days.
Before the installation of finished flooring on the ground floor, which was a slab on grade, a moisture problem was again discovered. The solution was the same system as the first floor, 100% solids epoxy and self leveling underlayment. We worked with the contractor to come up with an aggressive schedule, as they had no time to spare. We start on a Thursday night and by Monday morning the floor was ready to receive finished goods.