Welcome to the Installation Video for the Gorilla Post Magnetic Mounting System. Using lag screws and sleeves for asphalt installation.
First, sand the underside of the Gorilla Post base plate. Place a piece of tape on the underside center hole. Mark the holes on a level asphalt surface Drill the holes and clean out debris Check depth Fill holes with epoxy Insert Lag Sleeves Apply a generous amount of epoxy on the plate bottom and set it in place. Use the supplied screws to fasten the plate Clean off any excess epoxy Wait 24 hours before attaching a Gorilla Post Aline the center bolt and drop it in the center hole of the base plate. Remove the Gorilla Post with the removal tool. Please contact us at GorillaPost.com or call us at 1-800-292-7275.














