Ok. So this bathroom is finally finished. It was gutted back in May - so let's just say it took a long time. Originally I was going to build the vanity, but that didn't end up panning out. Instead I bought a damaged vanity from Lowe's and painted it green and installed the hardware, sink and faucet that I would have used in the other vanity, had I built it. I built the recessed shelving unit when I realized there were zero storage options. The trim has been painted three times. I finally settled on a satin black paint for the doors and trim. Shower is tiled in large matte white(ish) hexagons with pewter colored grout. Floor is tiled in a wood-look large format tile. Wallpaper is from hygge & west (again). Lights are from cedar moss and schoolhouse electric. I'M SO GLAD THIS IS FINSHED. Thanks to everyone who helped me out along the way (@sarelektro / @narkiewicz) #howihygge #cedarandmoss #bathroomremodel















