Time to put some shoes on Object 279.
And there's double the number than the usual tracks on a tank....
Four of them.....
I've started with the length that would be in contact with the ground....
And had to make sure I've got the orientation right way. Triangle shape in the tread points forwards underneath and then travels up and backwards to the rear.
I'm going to make them up in sections for ease of painting and weathering before I reassemble the parts as a full length run...
There are a few uneven joins, I can live with it though. By the time I add soil and mud for weathering, it'll be a non event....
Here's a T-64 tank, the running gear is similar enough to act as an inspiration/ reference
6 January 2022












