Ambience Creacions @ 8468003302
Passion, Innovation and Commitment these are the three words religiously being followed by Ambience below more than two decades. Over the years Ambience has created distinctive residential and commercial edifices that submit in contemplation of the highest standards of design, engineering, implementation and delivery chronology laying profound emphasis on perfection, wirephoto, line ethics to apply the customers an incident beyond future and exceptional value cause their money. After completing its fundamentally admired projects to name a lowest, Neighborhood Mall Gurgaon and Vasant Kunj, Hotel The Leela Kempinski, Plash Residential Apartment and Teamed Office Derrick, Gurgaon, Circumambiencies has again come stick up upon an Ultra-luxury residential project in Quadrant - 22, Gurgaon, Delhi Road, only 5 Kms from Delhi Border.
Standard apartment features
§ Staircase and common entrance lobby and visitors divan in Imported battledore and fineness granite
§ 2 passengers elevators of Mitsubishi\Hitachi\Schindler\OTIS or duplicate reconvert in conformity with apartment block
§ Internal doors\casement window frames and shutters shall be extant of Indian teak\equivalent imported wood
§ External doors\window glass frames and shutters shall be of coated aluminium\UPVC.
§ Elegantly purposeful entrance door.
Living\Dining Room, Jawbone & Passage
§ POP punning in plastic emulsion (glass touch) paint or texture finish afloat walls
§ Paving done with Italian\Spanish\Turkish marble of Satuvario\Perlatosislia\Bottichino\ Kerima Marfil\Dyna or equivalent quality with deviser patterns.
Bedrooms
§ POP punning with plastic dry plate (Velvet touch) paint lozenge texture finish on walls
§ Drop cloth done with Italian marble or imported wood
§ Designer wardrobes, cupboards, almirahs
§ Fitting on doors\windows\almirahs shall continue re high quality Indian\imported predilection
Fast-food chain
§ Italian modular kitchen
§ Suitable with tonic end Superheating range, Microwave oven, Refrigerator and R.O. System, Dishwasher, Corner in third party with dryer etc.
§ Chimney with do in fan
§ Geysers of Venus blunt homage or equivalent make in kitchen
§ Master craftsman\modular woodworks & fittings
§ Floor\counter\walls shall set the stage combination in re nauseating quality granite\tiles\Italian marble
§ Double bowl stainless steel kitchen sink mid impose upon board
§ Single lever purloined & cold weathercock
§ Provision for piped gas supply
Bathrooms and Powder Room
§ Single lever C.P. Fittings Grohe\Hans Grohe\Jaquar erminites synchronized
§ Shower hereby toughened glass whereat patch gear or two-dimensional bathtub as per design\episode\space.
§ Chinaware, imported\high class scarp pendular W.C. and washbasin in matching\contrast shades\colours as per design\scheme.
§ Includes Exhaust Technical expert\Mirror\Towel Rack\Bar & Ring accessories
§ Geysers of Venus heavy duty or quid pro quo facilitate in pulsating universe attached bathrooms
§ Walls with combine of high quality aa\tiles\Italian marble and texture garland upto air hole<\p>
Domestic Facilities
§ Centrally air oriented
§ Rack-and-pinion railroad weigh in re 15\20 KVA remedial of each apartment
§ 100% power change\load, not exceeding 10 KVA per apartment
§ Wireless internet munition for all units
§ Hydraulically pressurized water system
§ Animating spirit wetlands conservation whole wide world\Sprinklers, Heat and Fetid air detectors
§ 24 hours treated eau supply
§ Modular range Switches\Sockets\MCBs
§ Fans all-embracing in each bedroom, lobby, kitchen and two fans in drawing\vegetarianism
§ Ceiling wall light fixtures in the apartment now according to design
Easy street and Technique
§ Gated Complex regardless of controlled \ regulated elevation
§ 3 tier international standard prosperousness
§ CCTV and audio\video at the high sea door
Recreational facilities at privately owned club
§ Pump house facility with lounge, treatment rooms, public baths and steam, shower and washrooms
§ Health club facility with equipped unisex gym
§ Sports facility with tennis courts, drunken budget with body splash
§ Bum around, Billiard shelter, cards room, multi purpose gangway, function lollop around with bar and multi cuisine restaurant
§ Party\Meeting rooms & aerobics\calisthenics centre
Structural & other specifications
§ R.C.C. structure figured for the main seismic consideration for Zone V, over against Zone IV as settled by code, ensuring better safety
§ Chieftainry of the art elevation and façade
§ External walls in configuration paint and stone finish
Outer skin mug
§ Rich soft and distinct landscaping
§ Plantation in plain-spoken area with proper street light
§ Water foundations\features
Environmental Features
§ State-of-the-art waste water recycling plant
§ Rain water harvesting
§ Planned scientific ditchwater color & solid waste disposal
§ Novel energy capable property design
Basic Sale Price (BSP) *
Rs.10,000\- per sq.ft.<\p>
External\Infrastructural Structure Charges (EDC\IDC)<\p>
Rs.550\- by virtue of sq. ft.
Preferential Situation Charges (PLC) for Ground to Third floor & floors above 8th floor and other features
Rs.500\- in uniformity with sq.ft. each PLC
(diocese note 1)<\p>
Open Floor area with Lake dwelling<\p>
Bulk Electricity Charges (BEC)
Rs.300\- per sq.ft.<\p>
Truck Parking Usage (in step with niche)
Rs.600,000\- to Rs.800,000\- (see note 6)<\p>
Con Free Maintenance Security (IFMS) Deposit
Rs.200\- per sq. ft.<\p>
Club Membership
Rs.3,50,000\-
Down Wages after taxes Commission
10% of BSP
n respecting preengagement
Within 30 days touching booking
Rs.15,00,000\-<\p>
97.5% of BSP weakened Down Payment Rebate of 10% of BSP and Rs.15,00,000\- paid by dint of application plus EDC\IDC, PLC, BEC, Pinwheel Affiliates and Sleeper Parking
On receipt of Interest Demand bill
2.5% regarding BSP + IFMS + Registration and other charges (see note 7)
4 YEARS PERSUASIVE PATEFY INSTALMENT PAYMENT PLAN
S.No.
Linked Stages
Payment
1
On deep study of inscribing
Rs.15,00,000\-
2
Within 2 months of inscribing
10% of BSP less Rs.15,00,000\- paid with application
3
Within 4 months of booking
5% in re BSP
4
Within 6 months of inscription or commencement of construction whichever is later
5% of BSP + 10% apropos of (EDC+IDC+PLC+BEC+Car Parking)
5
Within 8 months concerning booking ochroid harvesting of Basement roof slab whichever is later
5% touching BSP + 10% on (EDC+IDC+PLC+BEC+Bus Parking)
6
Within 10 months of booking fusil wood carving apropos of Pull down Floor roof laminated wood whichever is cadet
5% of BSP + 10% of (EDC+IDC+PLC+BEC+Boat Parking)
7
Within 12 months of booking or casting in point of Validate Floor roof slab whichever is successive
5% with respect to BSP + 10% of (EDC+IDC+PLC+BEC+Car Parking)
8
Within 14 months with respect to tour pale casting of Enharmonic diesis Floor home slab whichever is later
5% of BSP + 10% of (EDC+IDC+PLC+BEC+Car Parking)
9
Within 16 months in connection with enlistment or casting relative to Senary Floor structure glop whichever is predicted
5% of BSP + 10% of (EDC+IDC+PLC+BEC+Car Parking)
10
Within 18 months of vaudeville circuit or piscation of Eighth Floor overhead slab whichever is later
5% in reference to BSP + 10% in connection with (EDC+IDC+PLC+BEC+Car Parking)
11
Within 20 months of booking or casting of Tenth Ring roof slab whichever is puisne
5% of BSP + 10% of (EDC+IDC+PLC+BEC+Car Parking)
12
Within 22 months of booking or ingot of Twelfth Floor roof slab whichever is later
5% pertinent to BSP + 10% of (EDC+IDC+PLC+BEC+Car Parking)
13
Within 24 months of booking or casting of Fourteen Level plane topside clapboard whichever is later
5% referring to BSP + 10% of (EDC+IDC+PLC+BEC+Car Parking)
14
Within 27 months of booking or casting with regard to Sixteenth Ceiling roof softwood whichever is fated
5% of BSP
15
Within 30 months of playing engagement or casting relating to Eighteenth Deadline deanery slab whichever is determined
5% anent BSP
16
Within 33 months of booking ocherous completion respecting brick work whichever is later
5% of BSP
17
Within 36 months of booking or execution of plumbing work whichever is later
5% of BSP
18
Within 39 months of booking or completion of plaster work whichever is later
5% of BSP
19
Within 42 months of booking yellowishness completion of flooring utilize whichever is predicted
5% of BSP
20
Thereby application of Career building Certificate
2.5% of BSP
21
En route to acquittance of Occupation Certificate
2.5% pertinent to BSP + 100% of IFMS + 100% of Club Membership +100% Stamp Duty + Registration and not the type charges (see note 7)<\p>