The Final Stretch
After Thanksgiving Break, there is only two weeks left for construction. Team Dogtrot is hitting the site full force to get each project completed! We have started the framing for the bench, countertop, and cabinets in the Kitchen Dogtrot and have started charring the wood for the cladding. Electrical for the lighting in each dogtrot is being installed very soon so we can move forward with building the structure for the ceiling. Details to keep the rope in tension for the screen are being tested. A combination of a turnbuckle or spring with steel cable and eye hooks is being considered.
11 days until completion. Here we go!