Photograph by Begüm Sarı
seen from Singapore
seen from United States
seen from United States

seen from United States
seen from Malaysia
seen from China

seen from Malaysia
seen from Spain
seen from Hong Kong SAR China
seen from United States

seen from Ireland

seen from Malaysia
seen from Ireland

seen from Greece
seen from United States
seen from Malaysia
seen from China

seen from Malaysia
seen from Belarus
seen from United States
Photograph by Begüm Sarı
Photograph by Doruk Atay
16 June
The other solution operation for the water and mud on the ground of site is adding rubble to muddy ground. Rubbles and gravels are using in order to to make a durable foundation. After the gravel implementation step, the ground of site was straighten. However, this operation caused elevation difference on the ground of site. So the crew worked on making smooth the ground of site. Digger operator went down below 8 metre from the road via a temporary ramp system, to the ground of building site. Then digger made smooth the land. Also some technicians controlled the elevation difference with some equipments. Digger fixed the level of ground on -7.75 m belowed the 0.00 point.
One more winner from TEDUarch!
Congrats to Hazal Gürgöze who won the 2nd place in PINarchitecture competition.
You can read jury comments from: http://www.pinarchitecture.org/#!feb-2016/a23du
We have a winner!
This is a collage work by Ufuk Uğurlar (TED University) and it won 1st place in PINarchitecture competition.
Congratulations Ufuk!
Producing the field
Photograph by Batuhan Önder