untitled

shark vs the universe
I'd rather be in outer space šø

gracie abrams
Fai_Ryy
Noah Kahan
EXPECTATIONS
Mike Driver
d e v o n
𩵠avery cochrane š©µ
Misplaced Lens Cap
One Nice Bug Per Day

⣠Chile in a Photography ā£
Claire Keane
h

oozey mess
Cookie Run:Kingdom Official!

No title available
official daine visual archive
Color Me Curious
seen from United States
seen from United States

seen from Lithuania

seen from Japan
seen from Germany

seen from United States
seen from India

seen from United States

seen from India

seen from United Kingdom
seen from Canada
seen from United States
seen from Netherlands
seen from Netherlands

seen from United Kingdom
seen from France
seen from United States

seen from Nepal
seen from Colombia
seen from South Africa
@prljavo-blog
Infrared Saturn and Titan
Abandoned N.A.S.A. Satellite Dish. Explored Nov 2, 2013
Immortal last words, āI donāt get it.ā ā Michael Lipsey
May 1, 1979 - EnterpriseĀ becomes first shuttle to roll out, laying groundwork for shuttle operations at KSC.
Following a year of vibration testing at Marshall Space Flight Center in Alabama, space shuttle Enterprise was delivered to Kennedy Space Center in April, 1979. Over the course of three and a half months, the mockup orbiter would validate Kennedyās modifications to accommodate the new fleet of space vehicles, which were a radical departure from the capsules the center was built for.
Enterprise was used to validate the new Orbiter Processing Facilities, and the procedures in them. Following this, the orbiter was then used to test and validate hoisting and movement operations in the Vehicle Assembly Building. Finally, technicians practiced assembling a shuttle stack by mating Enterprise to a pair of SRBās and an External Tank.
On May 1, 1979, the first-ever shuttle stack departed the Vehicle Assembly Building for LC-39A. Although the crawler has a maximum speed of 2 miles per hour, the stack was driven at various speeds in order to test vibration stresses during crawler transport. This was later used to determine optimal rollout speeds for future shuttle missions.
Once at the pad, technicians practiced fueling the External Tank for the first time - a critical step for Coulmbiaās Wet Dress Rehearsal in the monthās prior to her maiden voyage. This test revealed an undiscovered problem that endangered the orbiter and itās crew - ice buildup at the tip of the ET, where supercold Liquid Oxygen was venting.Ā
Engineers designed the Gaseous Oxygen Vent Hood - or beanie cap - to safely reroute vented LOX away from the shuttle stack. The beanie cap wasnāt originally part of LC-39ā²s modificationās for shuttle, but testing with Enterprise prompted the addition. The Enterprise stack returned to the VAB in early August, and the orbiter flown to Palmdale, California by October. The three months Enterprise spent on the pad marked a visual departure from previous operations at the cape. Instead of a single, pointy rocket on the pad, a squat, winged vehicle surrounded by service gantryās was seen. This would later be a normal site on the space coast as the shuttle fleet performed 135 missions over 30 years.
STAY WILD
H House (Vietnam) / VACO Design
Anywhere
Chasing the StormĀ
Tom Hardy photographed by Eric Frideen