Met this young fellow Felix. Quite the enchanting and magical spirit. Game changer...

seen from United States

seen from Bulgaria

seen from Türkiye

seen from Malaysia

seen from Poland

seen from United States

seen from United States
seen from Brazil
seen from United States
seen from United Kingdom
seen from Macao SAR China
seen from China
seen from United States

seen from Malaysia
seen from China

seen from Malaysia
seen from Italy
seen from United States

seen from China
seen from China
Met this young fellow Felix. Quite the enchanting and magical spirit. Game changer...
Michael Meissner - Fueling the Productivity Age - The Denver Post
Michael Meissner – Fueling the Productivity Age – The Denver Post
Michael W. Meissner is a technology innovator, the founder of Ethernautics Inc. The following article appeared in The Denver Post on Saturday, March 21, 1998 and signaled the era of the Smartphone. Save
View On WordPress
Ethernautics, Inc. - QR Codes
Ethernautics, Inc. – QR Codes
Ethernautics, Inc. makes extensive use of QR Codes.
Ethernautics.com in Red
copyright 2007-2016 Ethernautics.com
© 2007-2016 Ethernautics.com, http:/www.ethernautics.com All Rights Reserved
View On WordPress
Ethernautics, Inc.- Michael W. Meissner Copyright Notice
Ethernautics, Inc.- Michael W. Meissner Copyright Notice
Ethernautics Inc, Copyright Notice
© 2007-2016 Ethernautics All Rights Reserved
@2007-2016 Ethernautics.com All Rights Reserved
Ethernautics™ is a registered TM of Ethernautics, Inc.™ All Rights Reserved
BigFoot Shoe Company, Copyright Notice
© 2015-2016 BigFoot Shoe Company All Rights Reserved
@2015-2016 BigFootShoeCo.com All Rights Reserved
BigFootShoeCo.com™ is a registered Trademark of…
View On WordPress
Information Technology and Strategic Infrastructure Investment
Since the inception of Information Technology, Technology has been a strategic invesment for the enterprise. CFO's, CIO's and now CTO's have been looking for that Philosopher's Stone of turning Information Technology to gold and profits for decades. Architectures that are extensible and vendor neutral, are flexible and cost effective, provide strategic advantage to the organization.
Architectures should provide a foundation in which an organization leverages information technology to increase Revenue, Reduces Expenses, thereby increasing Profit. Simple math, R – E = P.
If the Enterprise Architecture and all its components doesn’t support that objective. Our business executives need to be asking the question, of why we are investing at all.
I would add that in the competitive world economy in which we live, the strategic advantages to increasing revenue and reducing expenses lies in Enhancing the Customer Experiance. Continuous improvements in this area demand the continued use of emerging technologies, thus the Enteprise Architecture to support them over the business cycle must be well engineered.” ~ Michael W. Meissner
Ethernautics, Inc. San Diego, California 92130 www.ethernautics.com
We are hiring 3 Electrical Engineers with Nuke Experience
Want to be an Ethernaut? Want to be a "Rockstar"
May 04, 2012
General:
Require Modification experience, especially functioning as the Responsible Engineer (RE) for preparing and issuing Modification Packages. Needs to be experienced in all aspects including Package Preparation, identifying Design Inputs, Design Checklist, Master Equipment Database and Master Parts List Database, Critical Parameters, Pre-Installation and Post Installation Testing, Installation Instructions, writing Technical Justifications, Affected Documents, Affected Databases, identifying Special/Interdisciplinary/Plant Impact Reviews, preparing 10CFR50.59 Screens, Design Verification, preparing Requisitions and Purchase Orders, preparing License Document Changes, reviewing and applying Operating Experience, performing Project Kick-Off Meetings, performing Design Review Meetings, scheduling, supporting Field Engineering and Work Planning, and working with a Condition Reporting system. Must be computer (PC) literate and capable of using basic software such as Word, Excel, and Powerpoint. Must be capable of performing with little oversight.
Requires functional knowledge of Cable routing, sizing and application, raceway installation and specification, separation requirements, sizing and application of breakers, fuses, and other basic electrical components and systems, lighting, distribution panels, UPSs, Inverters/Battery Chargers, transformers, MCCs, Switchgear, etc. Preferable to have knowledge of ETAP or other Electrical System Analysis type software. Knowledge of typical UFSAR Electrical section information and how to research and use the information. Understanding of system requirements including LOOP and Station Blackout and the impacts/requirements of the Electrical System. Understanding of all Electrical Calculations typically required at Nuclear Stations (Combustible Loading, Appendix R, Heat Loading, Ampacity, Protection Sizing, Equipment Qualification, Raceway Sizing, UPS sizing, Battery Sizing, Setpoint calculations, Uncertainties, Databases such as Setpoints, Fuses and Relays, etc.)
Email: [email protected]
We are Highering - I&C Engineers
Want to be a "Rock Start"? Be an Ethernaut!
May 04, 2012
General:
Require Modification experience, especially functioning as the Responsible Engineer (RE) for preparing and issuing Modification Packages. Needs to be experienced in all aspects including Package Preparation, identifying Design Inputs, Design Checklist, Master Equipment Database and Master Parts List Database, Critical Parameters, Pre-Installation and Post Installation Testing, Installation Instructions, writing Technical Justifications, Affected Documents, Affected Databases, identifying Special/Interdisciplinary/Plant Impact Reviews, preparing 10CFR50.59 Screens, Design Verification, preparing Requisitions and Purchase Orders, preparing License Document Changes, reviewing and applying Operating Experience, performing Project Kick-Off Meetings, performing Design Review Meetings, scheduling, supporting Field Engineering and Work Planning, and working with a Condition Reporting system. Must be computer (PC) literate and capable of using basic software such as Word, Excel, and Powerpoint. Must be capable of performing with little oversight.
Requires functional knowledge of Setpoints, Scaling, Uncertainties, instrument application and functions, computers (ICS), UFSAR descriptions, Precautions/Limitations/Setpoints document, Equipment Qualification, etc for all I&C equipment.
Email: [email protected]
www.ethernautics.com