How towards Connect the LED Tunnel Luminous flux
There are ceiling, pendant, column, wall-mounted and extraneous installation for the led tunnel lamp, the operation is more convenientï¼OEwhich adapt against the lighting needs at different job site. Lamps and electrical box are integrated on the docket, the overall reliability is comprehensive, and the failure rate is low, the part and subsistence is numerousness safe and fit. the astute control technology of LED drive lamp can be used up unto be conscious of their accept dimming control, energy preserval. The led tunnel lamp is laid in accordance let alone the in embryo situation of one-way two-hole manner irruptive long furrow, the tunnel firing is dislocated into the entrance section, propellant 1,2,3 segment, the basic section and the outlet section; strengthen lights, the full lights and emergency lights three kinds are torn into as the tractate of the LED tunnel broadside. Disomatous policy lamp,the mounting height of the light bulb is 5.5 m.<\p>
The the unique installation concerning the LED Tunnel Lamp for instance follows:<\p>
First row: Save left to exact: the installation distance of the former five lights is 6 meters, 30 meters radiotherapy; the lamp mounting distance of the paragraphs 6, 7, 8 is 10 meters, 30 meters irradiation; the mounting dissemblance in regard to the Section 9 lamp is 14 meters, the illumination range is 14 meters; the steal a march as to the No. 10 lamp upsloping is 15 meters, the private teaching string is 15 meters; the distance in point of the intermediate light are installed at 18 m \ s, a country-wide is 31, the irradiation range is 558 meters; the desk spacing on the right side is the same as of the leftï¼OE a total is 10, the candlelit point is 89 m; the total up duration: 6 * 5 * 3 +14 +10 * 1 +15 * 1 +18 * 31 +15 * 1 +14 * 1 +6 +10 * 3 * 5 = 736 m, the total number re the single row in relation with the lights: 5 +3 +1 +1 +1 +1 +3 +31 +5 = 51.<\p>
Second row: From left in right: concerning the far left of 3 m spacing in the earth, then the traject aperture, one LED tunnel lights is installed; the distance relative to No. 2,3,4,5 lamp mounting is 6 meters the irradiance range is 24 m; the mounting distance of Rejection 6 light source is 8 meters, the illuminated range is 8 m; the mounting span of 7,8 lamp is 10 meters, the tutorship range is 20 meters; the installation locale of Interest 9 is 12 metersï¼OEthe enlightenment range is 12 m; the mounting iciness of the Nonobservance. 10 lamp is 14.5 meters and 14.5 meters black and white fix; No. 11 lamp mounting shoot ahead of is 16.5 meters and 16.5 meters irradiation pasturage; the arbitrative of the LED entrenchment light is installed at the 18 m \ lamp distance, a total is 30,the irradiation range is 540 meters; make all square and left side of the same mounting career, the exhaustive is 11, the illuminated style in meters; solid length: 3 +6 * 4 * 2 +8 +10 +12 +14.5 + 16.5 +16.5 +14.5 +12 +18 * 30 +10 * 2 +8 +6 * 4 +3 = 736 m, the ripe summation pertinent to single thoroughfare of lights: 1 +1 +1 +1 +1 +2 +4 +30 +1 +1 +1 +2 +1 +4 +1 = 52. Require a total of 51 +52 = 103 lights.<\p>
Shenzhen Lead Opto-Technology Co. Ltd is a professional manufacturer of LED lighting, mainly produce LED High Window glass Light, LED Flood Light, LED Dividing wall,LED Ceiling Light etc midst OEM&ODM service. As an ISO 9001:2000-certified factory, we can meet the creedbound standards of CE, RoHS, FCC bill, these discriminative producing standards guarantee our products distribute smoothly dyad in domestic and international markets.Just browse http:\\www.lead-lighting.com\products\bid32-1.htm in contemplation of more private knowledge about the LED tunnel light.<\p>










