it’s the little things!
In order to get through this build, I have to break it down into bite-sized chunks (or Milestones), so that I do not get too overwhelmed with the whole project. Milestones in my head such as slab laid (tick), frames up (tick), windows arriving (tick) and this silly one….being able to vacuum!
Even though Scott said I was wasting my time, I had longed to be able to get the vacuum out and vacuum those floors; as for me it meant that we actually have defined rooms!
Scott was right, as the next day the floors were dirty again, covered in mud and hemp stalks and clay, but in vacuuming up the wood shavings, render dust and sand, I felt like another tangible Milestone had been reached!!












