Studio 4 - Project Schedule
From the start of this project, our group has managed to work well with each other remarkably considering we haven’t worked as a group before. As we near the finer details of the project, involving more decision making and designing, we’ve slowed down and haven’t managed to keep it in track. This is based on what I think our capability as a group.
This is why I tried to make a point for our Monday meeting to ensure that we write down expectations on what we want to get out of the meeting but also from the next coming weeks. For the recent 2 weeks, we have had meetings where it was a lot of talk and very little decision making. It felt a little slow. Whether or not that was meant to be the pace, I’m not sure but it didn’t feel right. A part of it was a lack of direction, not knowing what I should be doing.
We managed to write down expectations for the next 4 weeks, breaking the expectations into two main columns, Overall project and BCT Showcase. The difference between the two is that the overall project covers things like concept development and preparing for the pitch with AIAL while the BCT Showcase involves coming up with a book and poster for the BCT Showcase event.
The timeline goes as follows:
Overall Project - Determine one concept through a collaborative floor plan, implementing different technologies
BCT Showcase - Equipment list and location chosen
Overall Project - Prototypes of different technologies working together incl. playtesting. Narrative creation.
BCT Showcase: Planning book & poster design and content
Overall Project - Further develop prototype and produce portable version to show in AIAL pitch
BCT Showcase - Final draft of book and poster (finalised overall aesthetics and layout)
Overall Project - Writing pitch