Transferring from design to construction is always a tricky process. It is one thing to envision a desired outcome for a project and its another achieving it. The initial materials we thought we would use is transparent colourful sheeting and upvc piping, however as we moved closer towards prototyping we found out that there were other expenses we need to account for.
Along with this we chose our materials carefully. although there might be an emission of Carbon dioxide by the heating of the piping which was used to speed line the process instead of the crushing of the ends, the materials would be believed to have low to no maintenance needed for a prolonged period of time















