The first architecture I’m going to introduce is Jeffrey Inaba's firm INABA. It by the Red Bull Music Academy will be vacant four-story building teaching learning environment in New York 's Chelsea neighborhood. INABA have created a unique areas of cooperation instead of the traditional classroom walls and the use of dramatic lighting. Curved wall in 38,000 square feet of space to different shapes. Regional activities include performances, private workshops, music production and broadcasting, other space is used as shops, galleries, cafes. Central area suitable for large gatherings or performances.
The second one is a house in southern Ho Chi Minh City Vietnam Thong House. The owner is a nuclear family, including parents and two children. They want every family member can naturally resonate. NISHIZAWAARCHITECTS Architects, by Japanese architect shunrinishizawa, he was leading architectural firm in Vietnam, at the completion of this multi- townhouse project.
Located in the center of the staircase and along the corridor covered space around the house owner can let the natural meditation.
Roof garden provides a family to enjoy the nightlife in this new urban outdoor space. From the beginning until the end, stairs - because the house 's spine let us participate stop adventure, the entire residential unusual place.
Nursery in Alsace in a small village, the fortified castle as day nurseries, like a castle wall with opening walls to protect the children 's playground. This arrangement provides a rounded profile space Vosges Mountains, strict planning is a continuous rectangular arrangement of elements containing the project. Building is composed of a central core space appear in double height and natural light is like a kaleidoscope. This is almost a cubic volume of concentrated color from pink to red. Matte and shiny colors resonate forming space to make it richer and more subtle.
Final one is the local Japanese teaching materials wholesale company building, the first floor was asked to inventory the warehouse, second and third floors were asked 16 people maximum utilization of floor space and operations to implement and conference rooms. HMAA construction team will use the construction area to the extreme, to understand the comfort of business space and privacy issues, the afternoon sun, garden set forth by the perforated metal screen.









