Accelerating Electricity Transmission Infrastructure Development through Private Public Partnerships (PPP) Consultative Workshop organized by KETRACO (Kenya Electricity Transmission Company)

Product Placement
todays bird
Acquired Stardust
No title available
dirt enthusiast

Love Begins
Game of Thrones Daily

shark vs the universe
h

⁂
YOU ARE THE REASON
trying on a metaphor
TVSTRANGERTHINGS
ojovivo

roma★
Monterey Bay Aquarium
"I'm Dorothy Gale from Kansas"
No title available
I'd rather be in outer space 🛸
d e v o n

seen from Malaysia
seen from United States
seen from United States

seen from France

seen from Netherlands

seen from United Kingdom
seen from United States
seen from United States

seen from Canada
seen from United States

seen from Russia
seen from United States

seen from Türkiye

seen from United States

seen from Malaysia
seen from Romania

seen from Malaysia

seen from Finland
seen from Türkiye
seen from United States
@megaprojectske
Accelerating Electricity Transmission Infrastructure Development through Private Public Partnerships (PPP) Consultative Workshop organized by KETRACO (Kenya Electricity Transmission Company)
The Suswa Substation, Kenya’s largest substation. Built and managed by the Kenya Electricity Transmission Company KETRACO
The Ndumoto 3 Bridge spans 215 meters across the Ndumoto seasonal river. The river causes extensive flooding in the area which necessitated a bridge of such length. The bridge has adopted a 2 T shaped abutment on both ends.
The Mombasa-Nairobi Standard Gauge Railway - Redefining Infrastructure
#sgrkenya #sgrline #kenya #railway #emali #emalirailwaystation
The Masimba #Railway Station located 6km away from Masimba Town. #SGRKenya
Just freshly pressed. In clockwise from above, a forklift operator moves to a from stacking freshly baked Railway Sleepers at Section 7 Sleeper Factory. Below is a concrete batching plant, many of these have been installed along the railway to mix exact concrete ratios. Next is the steel frame for the Bridge Girders and last are the new trains for construction of the Standards Gauge Railway.
Among the wagons that have arrived at section 7 are the covered wagons, ballast open top hoppers, flat bed wagons and a locomotive engine. More are expected to arrive soon.
A gantry crane operator walks alongside the steel lifting unit to check that the hooks have locked on the load. The intense release of steam is from the steam kiln bath below which has just been opened. #RailwaySleepers are put under steam and cold water jets for 4-6 hours at 45 Degrees Centigrade after which they harden and are ready for removal. At the #EmaliSleeperFactory for the #sgrkenya railway.
Leaving work yesterday...
The Kenya Railways #9302 Engine on its way to Mombasa spotted at Sultan Hamud
A visit to the Sultan Hamud Railway Station is a true experience of the old Lunatic Express. Time at this station has literally stood still as history preserves the remains of vibrant station a long time ago
SGR Railway bars being delivered to the construction site. >>What was that guy behind there doing ??
The track laying machine at #Section7 SGR site in Emali. The machine is ready as it awaits the finishing of the inner rail construction at the site.
>>http://www.megaprojects.co.ke/articles/292/sgr-section-7-track-laying-machine/
Set 2 of the “Off Work” photographs. You can check out set 1 on the timeline :-)