12/23/19 New whole house water filter installed
Watts system. Definitely cleaned up some of the tainted water issues from the old city water pipes that we had been experiencing.
One filter is for sediment, one is for taste.
"I'm Dorothy Gale from Kansas"
Today's Document
sheepfilms
Not today Justin
KIROKAZE
EXPECTATIONS
RMH

PR's Tumblrdome
NASA

Kiana Khansmith

titsay

Jar Jar Binks Fan Club
The Stonewall Inn
Noah Kahan

izzy's playlists!
No title available

Andulka
Xuebing Du

oozey mess

Love Begins
seen from Malaysia
seen from Colombia

seen from United States
seen from Bulgaria

seen from Malaysia
seen from United States

seen from Türkiye
seen from United States
seen from Indonesia

seen from United Kingdom
seen from United Kingdom

seen from Mexico
seen from United States

seen from South Africa
seen from Malaysia

seen from Canada
seen from Iraq
seen from United States
seen from France
seen from India
@mycontemporaryhousebuild
12/23/19 New whole house water filter installed
Watts system. Definitely cleaned up some of the tainted water issues from the old city water pipes that we had been experiencing.
One filter is for sediment, one is for taste.
9/17/19 Cedar sealed and decks stained
We got a chance to seal the cedar and stain the decks..finally! At the end of the build last year, our appetite for spending more money on the build diminished, so we decided to take care of this important task to keep the wood in pristine condition for at least three years (hopefully).
Happy Fourth of July!!
Happy Memorial Day!
DAY 892
4/21/18 POST MOVE IN
Things are a bit more cleaned up..still tired from move and unboxing, but we have got the place in some semblance of order. Getting used to new house sounds, too. Floors adjusting to humidity levels.
These items were finished over the last 10 days.
Lutron device install.
LED lighting install.
Humidification continuing (around 36-38%).
Still need to finish these items:
Mailbox install (4/24).
Garage floor painting (4/27).
Basement carpeting.
Punch list items (cable/ethernet run to basement and lots of little other things).
Generator install.
DAY 881
4/10/18 MOVE IN DAY!!
After 881 days of build, we finally MOVED IN!! YAHOO!!
But we still have finish work to do.
Lutron device install continuing.
LED lighting install.
Garage floor painting.
Basement carpeting.
Punch list items (cable/ethernet run to basement and lots of little other things).
Generator install.
Humidification continuing.
A beautiful front door. Cedar sandwiching mahogany frame.
DAY 869
3/29/18 Punch list items continue, sconces/humidifier installed.
Due to the dry winter and no humidification, our white oak floor boards were starting to separate. We since got a humidifier (Honeywell HE300A1005) and are in the process of rehumidifying the house from 22% to 40%. Hopefully, this, some wood paste and a final sand/seal should fix the issue permanently.
Lots of punch list items completed.
Selected colored outlet covers for kitchen, hearth.
Next
Lutron device install continuing.
Punch list items (cable/ethernet run to basement and lots of little other things).
Generator install.
Fix dried out wood floors.
Move in date 4/9!!
DAY 865
3/25/18 Motorized shade installed.
No pics of final shades, as we got locked out of house.
Landscapers moved japanese maple and crepe mrytle.
Lots of punch list items completed.
Humidifier installed because floor planks separating.
Selected carpet for basement and style of garage floor paint.
Next
Lutron devices need fixing by home automation tech.
Punch list items (cable/ethernet run to basement and lots of little other things).
Generator install.
DAY 861
3/21/18 Punch list items.
Progress over past couple of days, snowstorm notwithstanding.
Kitchen baseboards/kickplates completed.
Final kitchen handles installed.
Cedar lattice door frame done, door being worked on.
Next
Lutron devices need fixing by home automation tech.
Punch list items (cable/ethernet run to basement).
Motorized shade delay because brackets wrong size (Friday?).
HVAC humidifier install because wood floors drying out.
Generator install.
DAY 857
3/17/18 Run through punch list.
Progress over past week
Shoe molding work completed.
Minor plumbing work.
Cedar lattice work completed.
Foyer/dining room fixtures hung.
Closet shelving systems installed.
Initial cleaning.
Next
Lutron devices to be configured by home automation tech.
Punch list items (cable/ethernet run to basement, kitchen baseboard).
Motorized shade delay because brackets wrong size (Monday).
HVAC humidifier install because wood floors drying out.
Generator install.
DAY 848
3/8/18 Remaining items.
Progress
Fireplace hearth being wrapped in white oak.
Shoe molding work.
Minor plumbing work..
Cedar lattice work continues.
Next
Lutron devices to be configured by home automation tech.
One more coat of sealer to be applied this weekend (weather delay).
Shoe molding (Monday).
Foyer/dining room fixture hang (Monday).
Closet systems (Tuesday).
Punch list items (cable/ethernet run to basement, kitchen baseboard).
Motorized shades (next Thursday).
Generator install.
DAY 842
3/2/18 We got the certificate of occupancy!!
Town engineers approved grading plan!!
Progress
Fireplace hearth being wrapped in white oak.
Minor plumbing work.
Bank appraiser came out on 2/23.
Next
Lutron devices to be configured by home automation tech.
One more coat of sealer to be applied (TH/FR).
Final painting.
Shoe molding.
Generator install.
DAY 842
3/2/18 Waiting on CO, lattice going up.
Thought CO was done; looks like town engineers need to approve grading plan, so slight delay. Hoping for CO documents today.
Progress
Insurance inspector came out to measure house.
Final painting continues.
Remaining trim touch ups continue.
Lutron devices being setup.
Next
Lutron devices to be installed by electrician, to be configured by home automation tech.
One more coat of sealer to be applied after painting.
Final bank inspection to move construction to permanent loan (SA/MO).