Summer Updates 2017. Making Progress!
^The Student Center Addition -- July 13th 2017
^The new Health Center -- July 13th 2017
Renovations, new buildings, (and everything in-between) have all made for an eventful summer at Bennington College. Much of our work has been dedicated to preparing the Student Center addition, as well as the new Health Center.
These facilities will help make the Commons renovation possible, while still providing necessary dining and health/psych services to the campus community.
Student Center Addition--May 24th 2017
^May 24th 2017. Excavating for foundation of student center addition.
^June 7th 2017. Laying rebar for concrete footings of foundation.
^ May 24th 2017. Early excavation of stormwater retention basins, which will control runoff from rain and snowmelt from student center landscape.
^June 7th 2017. Stormwater retention basin in action!
May 24th 2017. Site work for the new building and temporary dining facilities. Unfortunately, a storm came through a few days after this photo was taken and knocked down five or six of the pine trees (shown to the right).
^June 7th 2017. For safety reasons, we decided to remove the remaining pine trees in this stand. For more information, see “Landscaping around the Student Center” on the Campus Renovations webpage.
Student Center Addition--July 13th 2017
The Student Center Addition will serve as additional seating for dining operations during the Commons renovation. For more information see previous blog post “The Student Center: Temporary Dining Conversion”
^July 13th 2017. As a pre-fabricated steel building, the Student Center addition popped up literally over the weekend! The new building is scheduled to be online for Fall term.
On the inside of the Student Center, we have made some significant changes to create a dining space ready for full meal service.
^ May 24th 2017. Beginning construction of the new salad bar.
^ May 24th 2017. Still in the process of moving, with plenty of cleanup work to do.
^ July 13, 2017. Student Center Salad Bar completed, self-cook stations included.
^ July 13, 2017. Look familiar? Most of the cabinets in this salad bar were actually re-purposed from the Commons kitchen.
^ July 13th 2017. The Student Center is already serving meals to summer programs!
v Student Health Center--July 13th, 2017 v
Across campus, the new Health Center is close to completion. For more information on this project, look at our earlier post, “Preserving the Past, Planning for the Future.”
^March 23rd 2017. This building is nestled between the East Academic Center, Meyer Recreation Barn, and Buildings & Grounds.
^ March 23rd 2017. An interior view of the Health Center waiting room.
^ July 13th 2017. Waiting room with sculptural LED light fixture.
^ March 23rd 2017. A corridor, still undergoing mechanical and electrical work.
^ July 13th 2017. The same corridor with ship-lap, paint, and LED lighting systems.
^March 23rd 2017. The doctor’s office--storing mechanical equipment soon to be installed throughout the building.
^ July 13th 2017. Doctor’s office reaching completion.
^December 16th 2016. Stone shelf original to building.
^ July 13th 2017. New office in Psychological Services wing.
^ March 23rd 2017. New windows, vapor barrier (green), and insulation (pink).
^July 13th 2017. A view of the rear porch.
^The renovation of this historic building has involved improvements to insulation and weatherproofing, as well as highly efficient heating, cooling, and lighting systems.
EAC Post Office--July 13th, 2017 .
^As a brief aside, the Post Office in the East Academic Center is up and running! You can come here for letter mail, whereas large packages can be picked up and delivered from Buildings & Grounds. Soon, mailboxes will be installed in The Barn where inter-college mail and notices will be placed.
Commons--July 13th 2017
^Commons has been mostly emptied in anticipation of renovations. Furniture, light fixtures, doors, and countless odds and ends have been either stored, repurposed, or donated to the community.
^The Commons salad bar has been re-purposed in the Student Center
^These paintings will be put into storage in anticipation of future enjoyment.
^ Since Commons is currently an epicenter for the network fiber around campus, we needed to reroute fiber lines across campus to ensure internet connection stays online during the renovation. As of July 26th, the grass is growing back :)
Between bringing new life to old buildings and introducing new facilities to meet our needs, the Commons renovation and associated projects are certainly making a mark. Thanks for checking in--we’re sure there will be plenty of updates ahead!