(Re)Builders
This place is getting busier every day! We have tons of tradespeople on-site, pushing to make Commons a reality. Structural steel, insulation, electrical lines, sprinkler systems, ventilation, and mechanical rooms are the building blocks of this renovation, helping Bennington College keep momentum towards a Spring 2019 completion goal.
Sometimes “building blocks” are literal blocks. This tower of concrete is the new passenger elevator shaft, which will facilitate accessibility to all levels of Commons.
Who knew that concrete could be pumped through a hose to the third floor? These workers are replacing an old concrete slab which had begun to curl and buckle from old age. Now the floor looks shiny new!
These new dormers (really tall windows) will let some beautiful morning light into the “bridge” between the north and south sides of Commons. It looks like this carpenter is also enjoying the new views of Crossett Library and Mt. Anthony!
For most of campus, bright red waterproofing is the current face of the Commons renovation. This material will live underneath the new slate roof, and help prevent any leaks or water damage.
Upon close inspection, we found that the copper roofs on our iconic cupola are wearing thin and letting water into the structures below. To prevent future sogginess, we will replace the copper roofs--as well as paint, replace, and restore the wooden components as needed.
What a ride! Roof repair is certainly not for the faint of heart. Fortunately, the photographer wasn’t afraid of heights. Thanks for staying updated on the Commons renovation! The fascinating world of design and construction maintain this project as a labor of love for the team at Bennington College. Have questions or concerns? Email [email protected].









