Montreal’s Champlain Bridge is one of North America’s busiest spans, with 50 million cars, buses and trucks crossing it each year. The project includes: The construction of the new 3.4-kilometre Champlain Bridge; A new 470-metre bridge for L’Île-des-Sœurs; The widening of Highway 15 between the Atwater interchange and the new bridge; The improvement of the ramps leading from Highways 132 and 10 on the South Shore to the bridge. In addition, the project incorporates: Rigorous environmental monitoring and mitigation measures to protect the surrounding natural environment; Architectural quality and features that will enhance Montreal’s cityscape and contribute to the corridor’s status as the main gateway to the city; A corridor reserved for public transit and a safe, accessible multi-use path for pedestrians and cyclists. Image Courtesy: New Champlain Bridge New Champlain Bridge Corridor Project to the Design and Construction Group comprised of: SNC-Lavalin Dragados Canada Flatiron Constructors Canada EBC Inc. Bridge Design Team: SNC-Lavalin TY Lin International International Bridge Technologies Highway Design Team: SNC-Lavalin MMM Group #bridgeproject #architectures #engineering #construction #futureproject #transport #innovation #design #art #technology #contractors #development #Montreal #Canada (at Champlain Bridge, Montreal) https://www.instagram.com/p/B0Tvii7B6vi/?igshid=1di0ie4ngxknr