Integrated Cold Chain - Industrial Subsidy
The scheme was introduced to enhance the infrastructure for Cold Chain Logistics, Preservation and value addition facilities so that there will not be any break from the farm gate to the consumer in order to reduce post-harvest losses of horticulture and non-horticulture agri-produce. This will enable linking groups of producers to processors and market through a well-equipped supply chain and cold chain, thereby ensuring remunerative prices to farmers and year-round availability of food products to consumers.
Pattern of Assistance
Maximum grant amount – Rs. 10 Crore
For storage infrastructure including Pack House and Pre cooling unit, ripening chamber and transport infrastructure at the rate of 35% of eligible project cost for General Areas and at the rate of 50% for North East States, Himalayan States, ITDP Areas & Islands.
For value addition and processing infrastructure including frozen storage/deep freezers associated and integral to the processing at the rate of 50% of eligible project cost for General Areas and at the rate of 75% for North East States, Himalayan States, ITDP Areas & Islands.
For irradiation facilities at the rate of 50% of eligible project cost for General Areas and 75% for North East States, Himalayan States, ITDP Areas & Islands.
Eligible Facilities for Grant
Integrated Pack-house (with mechanized sorting & grading line/packing line/waxing line/staging cold rooms, etc.)
Ripening Chamber(s)
Cold Storage Unit(s)
Controlled Atmosphere (CA) Storage
Frozen Storage/Deep Freezers
IQF Line, Tunnel Freezer, Spiral Freezer, Blast Freezer, Plate Freezer
Vacuum Freeze Drying
Milk Chilling/Bulk Milk Cooling/Automatic Milk Collection Unit/Milk Processing Unit (including packing) for which temperature control is necessary during some part of the processing. (Maximum 50 nos. of Milk Chilling or Bulk Milk Cooling or Automatic Milk Collection Unit to be assisted per project.)
Poultry/Meat/Marine/Fishery Processing Unit
Packaging Line for Chilled/Frozen/Temperature Controlled Products
Food Irradiation Unit
Refrigerated/Insulated Transport
Pre Cooling Unit(s)
Mobile Pre-coolers
Retail Refrigerated Carts, Temperature Controlled Solar Powered Retail Carts (Maximum 10 numbers to be assisted per project.)
Reefer Boats (Maximum 10 numbers to be assisted per project.)
Refrigerated Containers including Multi-modal Container Units
Renewable/Alternate Energy Technologies (Solar, Bio-mass, Wind etc.) for the project.
Accessories/Support Infrastructure/Utilities such as Fixed Racking System in Cold/CA Storage, Fork Lifts, Reach Trucks, Bins, Insulated Fish Boxes, Pallets, Dock Levellers, Mezzanine Flooring, ETP, Boiler, CIP Unit, Depodder, Peeler, Slicer/Dicer, Blancher, Sorting/Grading Line, etc.
In-house Product Testing Laboratory
Any other modern technology for temperature controlled storage, processing, value addition and preservation infrastructure as may be decided by Inter Ministerial Approval Committee (IMAC).
Ineligible Items for Grant
Compound Wall
Approach Road/Internal Roads
Cost of Land and Site Development
Administrative Office Building
Canteen
Labour Rest Room and Quarters for Workers
Security/Guard Room or Enclosure
Consultancy Fee, Taxes, etc.
Other Non-technical Civil Works not related to Cold Chain or Storage Infrastructure
Margin Money, Working Capital and Contingencies
Fuel, Consumables, Spares and Stores
Transport Vehicles other than the Reefer Trucks/Vans/Refrigerated Carrier/Insulated Vans/Milk Tankers
Pre-operative Expenses
Second Hand/Old Machines
All Types of Service Charges, Carriage and Freight Charges, etc.
Expenditure on Painting of Machinery
AC Ducting, Furniture, Computers and Allied Office Items
Closed Circuit TV Camera and Security System Related Equipment
Consultancy Fee, Taxes, etc. on Plant and Machinery
Stationery Items
Plant & Machinery not directly related to Cold Chain Infrastructure
Fire-fighting Equipment, Fly Catchers, Hand Washer, Laundry etc.
Reconditioned and Refurbished Plant & Machinery
Time Schedule and Release of Payments
Time schedule for completion and operationalization of project will be 20 months for projects in General Areas and 24 months in North East States, Himalayan States, ITDP Areas and Islands from the date of issue of the approval letter for the financial assistance.
Sl. No.
Particulars
Amount
Time Period
1
1st Installment
25%
8 months
2
2nd Installment
40%
6 months
3
3rd Installment
35%
6 months
Total
20 months
Our Unique Services
Preparation of Detailed Project Reports (DPR)
Layout Drawings
Facilitating various permissions required from various Govt. Departments
Error free application processing for various subsidies and incentives
Facilitating the arrangement of subsidies and incentives from Govt. Departments
Advisory on Purchase of Machinery / Technology and Civil works
Learn more visit: https://uniqueexim.in/industrial-subsidies/Mofpi/integrated-cold-chain