Sometimes there is a need to make a drop in the invert level alignment at the pit. This could be for many reasons. Sometimes there is a need to deepen a pipe to avoid clashes with other assets. Sometimes there is a need to dissipate energy in the pipe. By introducing a deliberate drop in the pit you are forcing the inlet pipe to direct the flow to the pit wall thus reducing the velocity head in the system.


















