My last lab report, the longest of them all and biggest percentage of my grade!!
You’ll never guess what happened in this hecking lab. So we were dealing with air-tight glassware and liquid nitrogen and a heater (lots of safety precautions necessary lol). So it took about an hour of prep, and then finally we could start our runs. In sum, we were measuring the nitrogen pressure in the tubes, so it was v important that we opened and closed the right valves at ALL times. After about the 6th run, I’m in a groove, double checking every valve as I go, and boom I close the valve to take the next reading and it skyrockets. Basically, each pressure equilibriates off of the last, so if you screw up, you have to start over from the very beginning, including re-prepping. I felt so incompetent, assuming that I had screwed up somewhere even though I truly remember closing everything correctly. So I get the demonstrator, he takes a look, agrees that it’s skewed. He was like it’s okay, it happens. He shuts everything off, except the pressure is still fluctuating like crazy! Turns out, there was a fricking LEAK in the glass somewhere. We had to start the whole thing over and it took 5 hours total, but AT LEAST it wasn’t my fault :-) lmao














