KSC-20190830-PH_JBS01_0028 by NASAKennedy https://flic.kr/p/2h7PjeB

seen from Singapore

seen from Germany

seen from Singapore
seen from Malaysia

seen from United States
seen from United States
seen from Japan
seen from United States

seen from France

seen from Singapore
seen from China
seen from United States

seen from United States
seen from United States

seen from Malaysia
seen from China
seen from United States

seen from China
seen from United States
seen from Canada
KSC-20190830-PH_JBS01_0028 by NASAKennedy https://flic.kr/p/2h7PjeB
Repost from @explorenasa using @RepostRegramApp - Look up! ⬆️ NASA's mobile launcher is inside High Bay 3 at the Vehicle Assembly Building (VAB) on Sept. 11, 2018, at NASA's Kennedy Space Center in Florida. In view are several levels of the new work platforms. One level has been extended around the mobile launcher tower, and the crew access arm, in view at the top, is being extended. The mobile launcher will spend seven months in the VAB undergoing testing. The 380-foot-tall structure is equipped with the crew access arm and several umbilicals that will provide power, environmental control, pneumatics, communication and electrical connections to the agency's Space Launch System and Orion spacecraft. Exploration Ground Systems is preparing the ground systems necessary to launch SLS and Orion on Exploration Mission-1, missions to the Moon and on to Mars. Credit: NASA/ Frank Michaux #nasa #groundsystems #mobilelauncher #orion #sls #moon #exploration #engineering #vab #spacecoast https://www.instagram.com/p/Bn4-5xdge4D/?utm_source=ig_tumblr_share&igshid=g5rpqpcuidb6