No Dig 500GPM Mud Cleaning System To CPP
500GPM mud cleaning system is the very tipical size for No Dig drilling rig. GN just finished 2 sets 500GPM No Dig mud cleaning system to CPP and ready for delivery next week.
Why A Mud Cleaning System Wil Be Required For Drilling Rig?
To separate drilling cuttings our from drilling mud, so that it can be re-used to save cost
To add new chemicals and keep mud suitable density and viscosity
Environment requirement make you hard to get rid of dirty mud only clean water
Standard Parts And Requirement For No Dig Mud Cleaning System From CPP
One set GNZS703 shale shaker with max 7.5 G force and 3 pc shaker screen
One set GNZJ703 mud cleaner with one desander cone and 8 desilter cones
2 sets centrifugal pump sit on tank sid for mud transfer
One set mud tank with compact desigh for small footprint
Walkways and handrails that can be folded on tank side
Control panels fix on tank without disassemble when moving
Please visit GN Web for details equipment spec and more news