i Manager U2000 Web LCT, RTN 950/950 A #HUAWEIRTN #HUAWEI #RTN950 #iMana...

seen from Australia
seen from Argentina
seen from United States
seen from Kazakhstan

seen from United States

seen from Malaysia
seen from United States

seen from United States
seen from Japan
seen from China
seen from Yemen

seen from United States

seen from China
seen from United States
seen from United Kingdom
seen from United States
seen from United States
seen from United States
seen from Saudi Arabia

seen from Malaysia
i Manager U2000 Web LCT, RTN 950/950 A #HUAWEIRTN #HUAWEI #RTN950 #iMana...
Huawei OSN 3500 SNCMP Function Boards
Huawei OSN 3500 SNCMP Function Boards
As a world leading Huawei networking products supplier, Hong Telecom Equipment Service LTD(HongTelecom) keeps regular stock of Huawei router and switch and all cards at very good price, also HongTelecom ship to worldwide with very fast delivery. For related articles, visit the HongTelecom Blog and HongTelecom WordPress. For real pictures of related product, visit the HongTelecom Gallery
View On WordPress
Cautions of Insufficient OSN 8800 Cross-connect Capacity on the U2000
Cautions on the Flash Memory Failure in DWDM Products
Summary: Because of defective incoming materials, the Spansion Flash memory units provided in a specific lot cannot erase Flash memory data. Huawei transmission boards equipped with these Flash memory units occasionally encounter a software uploading failure, patch upgrade failure, or log recording failure; or the boards sometimes reset unexpectedly or fail to boot from a reset.[Problem Description]
Trigger condition: The problem corresponding to this rectification notice is likely to occur when a board listed in the attachment is undergoing an upgrade/reset or backing up logs because of a Flash memory erasing failure. The probability increases with the frequency of erasing the Flash memory.
Symptom: Upgrade failure: When an involved NE is undergoing a software or patch upgrade, the U2000 displays that loading the software or installing the patch has failed.
1.Backup failure: An SCC board backs up the database every 30 minutes. When an involved SCC board attempts to back up the database after a configuration change occurs in the database, the attempt fails and the board reports a DBMS_ERR alarm. The new configuration is lost after the NE is reset.
2. Unexpected reset or failure to boot from a reset: An involved board is reset upon a component failure. During the restart from the reset, the board performs a Flash read/write check and fails to boot. Identification method: The boards in the attachment are at the risk of having this problem.
[Root Cause] The production process of Spansion is not well controlled. Due to production errors, the grating oxide layer on the Flash chip wafer is uneven. Horizontally, the oxide layer has become thinner because of corrosion. In a high voltage application (programming or Flash erasing), the oxide layer will be punctured and consequently erasing the Flash memory will fail. For a board equipped with a Spansion Flash memory unit, the Flash memory is erased when the board is undergoing an upgrade/reset or is backing up logs. The probability that the board fails to boot increases as the Flash memory is erased more often.
[Impact and Risk] 1.The boards listed in the attachment will occasionally encounter a software uploading failure, patch upgrade failure, or log recording failure; or the boards sometimes reset unexpectedly or fail to boot from a reset. 2.The following table provides the failure rate for each involved board.[Measures and Solutions] Replace all the boards listed in the attachment.
Preventive measures: Replace all the boards listed in the attachment. The following table provides the board information provided in the part number library.
Huawei’s OTN Bandwidth Cloud idea
To Construct OTN Bandwidth Cloud: 0 Waste, 0 Wait, 0 Downtime
1、40G/100G Shared Big Pipe, ‘0 Waste’ Bandwidth
Investment Protection: Platform share, smooth upgrade to 40G/100G×80 λ
100% usage: ODUk/ODUflex Matrix to get bandwidth share all over the network
3 40G solution include the 3rd 40G coherent tech cover 100% of app.
100G coherent Set up a record of 2110km in European trial, and 3000km in China Trial
2、OTN/PID O&E grooming, ‘0 Wait’ Provisioning
Non-block capacity: 2/4/9-D ROADM+3/6 T-bit OTN, free connection
PID: 8/12/20 λ line, OA free, DCM free, fast network construction
Fast TTM: No bandwidth reservation, no wavelength conflict, point to provide
3、ASON Intelligent & Reliable, ‘0 Downtime’ Service
Anti-multi fiber cuts: Intelligent O+E ASON, service non-broken
Fast localization: Universal NMS U2000, visual monitoring & management
Leading commercial application: Constructed all WSON network
Thunder-link.com now have OSN Series equipment and various board on promotion, more than 86% off list price, please come to visit www.thunder-link.com; or just email for inquire: [email protected]