Be sure to add our new Facebook page for course updates and pictures at www.facebook.com/btdagronomy
Mid-Summer Report: Summer of 2018 we have had nearly every weather condition possible. We started off with a very wet May and beginning of June. The week prior to the Men’s Member Guest we began entering a hot, dry, and low humidity stretch that lasted just over 4 weeks till we got a significant rainfall. Then from the middle of July to the current date of 8/8/18 we got back into a wetter pattern with heavier rain falls with plenty of heat and humidity. It looks to remain in that pattern for about the next week or so till the long range forecasts call for an eventual cooling of the temperatures which I am sure that more than the agronomy team are hoping for that break in heat to come sooner than later.
Course conditions from our stand point have overall been good. Some of the tees and some fairway areas did get a little too dry from that stretch of hot and low humidity weather. A majority of these areas are the result of irrigation issues such as heads not coming on, heads not spinning, and communication issues between our central command and our satellites in the field for the overnight watering. All these issues have been addressed but we cannot rule out more to come because of the age of the irrigation system. Then we have the other end of the playing field where some turf loss was due to mechanical issues such as cart traffic and getting into areas that were just a touch too wet where the mowers did a little more damage than good.
From a project stand point this summer we finished a beautiful landscape bed out by the tee on 6 Kodiak. We also had renovated both practice bunkers near the chipping green and are looking to finish up the small bunker on the backside of the range near the lesson tee. We had done some drainage work on the waste bunker in front of 8 Kodiak tee and plan to redo that bunker along with these waste areas sometime in the future. While on 8 Kodiak we had clear cut the fly over on the right side to help expose more of the green for the white, blue, and gold tees. We are making our best effort to keep up in managing the waste areas as a whole. We have sprayed most of them down with round up and once it started turning over we went in and deep raked it with a tractor followed by a sand pro. Again, sometime here in the future we will begin to address these areas with new drainage and sand.
We have the club championship here at the end of August on 25th and 26th. That is followed up by our Dry-Ject aerification where the company comes in and uses a machine that will create a hole and simultaneously fill it with sand. These holes tend to be gone somewhere between 5-10 days and are playable with minimal effect to putting. Looking out towards the end of fall (November) we will be core aerifying the tees, greens, and fairways. The bunker renovation project will be wrapped up this winter with just some primary bunkers left on 4,5,6,8 black bear.








