Installation precautions of explosion-proof electromagnetic flow meter
Precautions when installing explosion-proof electromagnetic flow meters for mining:
1. Axis of the non-measuring electrode must be approximately horizontal;
2. Measuring pipe must be completely filled with liquid ;
3. There must be at least 5*D(D is the inside diameter of the flowmeter) straight pipe section in front of the flow meter, and at least 3*D(is the inside diameter of the flow meter) length straight pipe section at the rear;
4. The direction of fluid flow is the same as the arrow direction of the flow meter;
5. A vacuum in the pipeline will damage the lining of the flow meter ,so special attention should be paid;
6. There should be no strong electromagnetic field near the flow meter;
7. There should be ample space near the flow meter for installation and maintenance