New Post has been published on http://240-sx.com/daughterboard-installing/
Daughterboard Installing
Daughterboard Installing
So you want to install a daughterboard on your 240sx but don’t know how to do it? Here is a very user friendly walk through on installing one. This goes for any daughterboard whether it’s from Moates, or Nistune, or even Nismotronic. It’s all the same. Today I will be showing you the installation of a moates daughterboard on a 1992 Nissan 240sx ka24de ECU.
Here are 3 makers of which offer daughterboards for Nissan 240sx.
Moates – Offers Chip burners, Emulators, Chips, and so much more!
Nistune – Is especially designed for Nissans having different type boards to work with any Nissan ranging from rb20det to vg30dett. Well known for there real live Data Tuning. Tune while the car is on and running! simple click burn methods really makes this method one of the best!
Nismotronic – Another Live tuning method of which I am not to familiar with. I spoke to a few people who have experience with Nismotronic and they simply state it is more user friendly.
Daughterboard Installing tools
Tools needed to install your daughterboard:
Phillips Screwdriver
Open up the ECU
De-solderer
Solder
Soldering Iron
What is needed to Install a Daughterboard?
Everything you need to chip your ecu can be found at the Moates website, link provided above.
1 Nissan Daughterboard
Minimum 2 SST 27SF512 8bit Chips
1 2×20 Pin Board
Walk Through for Installing Installing 240sx Daughterboard
The video provided will explain everything in a more in depth detail but here is a quick walk through. 1)First remove both front and back covers of your ecu. 2)Find the 2×20 mount located next the the red LED light. 3)De-solder the mounting spot. 4)Press on the 2×20 pin board with the short pins going into the board, taller pins sticking out. 5)Turn board over and solder each pin, careful to not have 2 pins solder touching. 6) while the board is upside down, look or the marking CJ1. It is on the underside just behind the red LED. 7)De-solder the little jumper from cj1 and drop it down or make a new jumper and solder is in the same direction just below cs1 so it will be on cs2. 8) once the 2×20 pin board and the jumper has been done, you may now install the daughter board.
You are now finished!
loadYouTube();










