Doulton/Bazalgette project
Pipeline - Clay excavated from the future sewer, 25m below Thames foreshore. Hand processed and fired from 801 - 1250°C. Grid ref : TQ29230 77594
seen from Germany
seen from Taiwan

seen from Malaysia
seen from Singapore
seen from United States

seen from United States
seen from Canada

seen from United States
seen from United States
seen from Georgia

seen from Türkiye
seen from Türkiye
seen from Philippines
seen from United States
seen from China
seen from Russia
seen from Germany
seen from United States

seen from India
seen from United States
Doulton/Bazalgette project
Pipeline - Clay excavated from the future sewer, 25m below Thames foreshore. Hand processed and fired from 801 - 1250°C. Grid ref : TQ29230 77594
Twelve days of seiving clay.
Excavated from 25m below the Thames foreshore by Tideway.
Stone sieved from Thames clay. Fired at 1020°C.
Delivery of first pallet of Thames clay for Doulton/Bazalgette Project. Processed by Potclays, dug from London's future supersewer by Tideway, delivered to me on Joseph Bazalgette's birthday.
Pipeline by Alison Cooke, is the first part of a site-responsive project that pays tribute to the work of pioneering Victorians ceramicist Henry Doulton and engineer Joseph Bazalgette, in constructing London's life-saving sewer system, a network that connected all its citizens.
The project uses clay excavated from London’s future sewer, currently under construction, to make a series of pipes that refer to the extruding process, salt glazing techniques and temperature firing experiments that made Doulton's non-porus ceramic pipes key to the safe transportation of London's sewage.
Before
Test pipes.
Five tonnes of clay spoil from 25m below the Thames foreshore, about to be processed at Potclays.
Thanks Tideway!!!