I have started moving in! I have been sleeping in the tiny house since my mattress was delivered at the beginning of the month. It has been glorious to wake up in my loft, hearing the birds outside and feeling so very much at home! The bathroom isn’t finished yet, there is no electricity and the propane hasn’t been installed yet, up until yesterday there was nothing to sit on and the floors were covered up with cardboard.
Here’s a recap of the work that has been done in the month since my last update:
The bathtub has been built! The drain was installed, but leaked, so we had to head back to the drawing board and after some consultation and a new drain basket, fingers crossed, I will have a functional tub at the beginning of June. Here are the tub progress pics.
The tub is based on Fourlights’ Ofuro tub and was modified to fit my house. My tub is mostly built out of plywood.
The fancy seat in the tub.
This is the filler coat over the fibreglass.
The holes cut out for the tub.
The toilet bench has also been built. The final coat of paint is drying as I type this. The toilet bench also accommodates the winter grey water tank and the fancy grey water plumbing. I have to attach the piano hinge for the two lids on the bench (one for the toilet and the other for the grey water compartment). The sawdust will live in a bin that will rest on the grey water compartment. The toilet will be ready early next week.
The red gas tank will be the grey water tank in winter.
A close up of some of the grey water plumbing. The big shutoff valves control whether the water goes to the interior or exterior grey water tank.
How many people can say that they have used their toilet for storage?
The kitchen counter has been installed! I am really happy with the counter I chose and with the amount of counter there is in the tiny house. The kitchen sink and faucet were installed and the freshwater plumbing is almost finished, with the exception of the countertop water inlet connection. As it’s spring, I am all hooked with a potable water hose and I have running water. The exterior grey water tank or french drain still has to be worked out, but as I am not living in the house full-time yet, it hasn’t been a problem yet.
The first countertop fitting. It needed a couple of cuts to get it sitting well in place and then the space for the stove was cut out. Once that was cut the counter was attached to the cabinets.
Some of the wiring for the infloor heating had to go through the cabinet. These wires will be covered with trim.
Another wire that had to go through the cabinet. This is the power source for my hot water heater.
Kitchen sink and faucet in place!
Kitchen counter already in use.
The kitchen ready for a stove and a kitchen party.
Here is the trim for the infloor heating thermostat all trimmed up
The trim for the infloor heating under the counter.
The HRV units got their boxes, which we filled with spray foam, and then they were finished. I am really happy with how the HRV units look and I get a bonus space above them to sneak in a knick-knack if the fancy strikes me.
#gallery-0-20 { margin: auto; } #gallery-0-20 .gallery-item { float: left; margin-top: 10px; text-align: center; width: 33%; } #gallery-0-20 img { border: 2px solid #cfcfcf; } #gallery-0-20 .gallery-caption { margin-left: 0; } /* see gallery_shortcode() in wp-includes/media.php */
The HRV box ready to be finished.
The HRV box getting its front piece installed
All closed up and ready to ventilate Tiny Refuge.
My electrical panel waiting for a small piece of panelling. That spot is empty so that the DC adapter for my stove and furnace can be installed and to easily access the wires going into the panel.
Left to do (nb: this is not an ordered list)
Get a welder to come out and weld on the brackets for the propane tanks.
Install the stove and the furnace.
Finish the freshwater plumbing.
Install the drain and faucet on the tub.
Install the lids on the toilet bench.
Install ¼” plywood on the front edges of the rafters for the roofers.
Figure out my clothing storage.
Install the last of the trim in the bathroom.
Install the medicine cabinet in the bathroom.
Have a house-warming party!