Looking at Cece's recently posted pictures of the outside of the tiny house, you might be thinking that we're pretty much done. The big door is set in, every last board of the exterior siding has been nailed on, and the roof is a vast ocean of Hawaiian blue. Culinary students and Montpelierite neighbors ask,"So you're just finishing up?" as they pass by on their way to class or on a dog walk. The answer to this question is simultaneously, "Yeah! We'll be done in a week!" and "No way, there is SO much more to do!"
Indeed, our group of fourteen has come a long way since we started building on October 7th, but a smörgåsbord of tasks both daunting and perfunctory will compete for our time and attention during the eight working days we have left. So, what does that finish process look like? Which details are we wrangling with at the moment? Here's a glimpse into our Yester-world this Wednesday, November 27th, 2013.
(also, mark your calendars for our open house! It's on Friday, December 6th from 4 to 6 PM at 33 College St. in Montpelier.)
Just as our morning meeting has disbanded, Jess and Ben discuss the ins and outs of waterproofing the bathroom. Jess has been applying a product called Laticrete Hydro Ban all over our bathroom floor to seal our wet bath and prevent moisture from escaping into adjacent stud bays and floor cavities. In the background, Chris and Nate ponder mockups of lighting fixtures. With Justin and a few dedicated individuals leading the lighting fixture charge, we can assuredly say our lighting will be one of the more original and inspired aspects of the project.
Lists - to buy and to do. (squeezed onto the whiteboard around doodles of regal unicorns and outer space)
Jim and Pearce check out Jim's mock-up of a cabinet handle. After establishing that we wanted to craft our own pulls and handles for the kitchen drawers and cabinets, Jim wasted no time in coming up with this innovative design that is, cleverly, both subtractive and additive. In other words, the handle appears to be made out of the material was removed, or subtracted, from the cabinet door (or stick of wood) and then added back on in a different manner.
Ned misses his partners in crime, Bill and Piglet. Fact: He is, by all reasonable measures, the most photographed dog in the city of Montpelier.
Kate (Yestermorrow's executive director) stops by for a look at the house, and the assembled group can't decide which board of the circus wall they find most overstimulating. Is Pearce's lime green one? Nate's board that's pretending to be a drawer? Cece's etched Yester manifesto? Eric's Swiss cheese? Come to the open house and decide for yourself.
Staying warm and dry in a raincoat and insulated Carhartt overalls, I am nonetheless happy to finish circus wall installation and get out of the sleet. Although today wasn't as numbingly cold as the past few days have been, this freezing sleet nonsense set the backdrop for one of the most unpleasant days to be outside this fall. We've been incredibly lucky to not have more days like this.
Cece and Nate are almost done with the first coat of paint. As a group, we decided to paint the interior walls and ceiling white to open up the space and create a clean, modern, aesthetic. We are using milk paint which is nontoxic, and, contrary to popular belief, not made out of ground cow bones. (Where did this rumor start?)
The paint comes in powder form, and then we mix it to our desired consistency. Refreshingly, the list of ingredients is easy to understand: casein (milk protein), lime (also known as calcium), and pigment. This basic formula has been used since the days of paleolithic cave painting.
Kasper, Ben, and Cece take a field trip to Jim Daniel's metal shop to cut and bend steel. Jim owns a collection of solidly built steelworking brakes, presses, shears etc., some of which date back to the early 1900s. Wouldn't it be nice if all our machines lasted that long? These pieces of Jim's equipment delicately handle steel as easily as our hands can crease as piece of paper. Kasper worked with Jim to fabricate pieces of structural steel trim for the big door, while the pictured sheet of stainless steel will be installed as a shower backsplash in the wet bath.
Lucas, Pearce, and Justin finagle Murphy (foldout) bed pieces together. After extensive research and instructional YouTubeing, Lucas ordered a Murphy bed hardware kit and is heading up a team to cut and assemble the frame and cabinet. The Murphy bed allows for the luxury of a queen-sized mattress in a tiny house-sized bedroom.
Ned continues to lead a difficult life as he whiles away his day dreaming of cleaning up after messy Thanksgiving eaters. Do you think he knows it's tomorrow? Although we work until 5 PM (or 6, or 7, or 8), mid-afternoon is where my day ended since I left early to come home.
Have a peaceful and gratitude-filled Thanksgiving.