To solve this problem, I had proposed a T.A.B work in this office to overall manager. T.A.B is originally intended to select the capacity of air-conditioner according to the each office's use and user arrangement at new site and to set the location of air-conditioner.
However, there were already 5 air-conditioners in office, and each one was discharged cooling air through 5 to 8 diffusers.
I had suggested that it should maximize the performance of already installed air-conditioner. To carry out it, it was necessary to replace poor air-conditioners, adjust the position of diffusers/lighting fixtures, and cut off radiant heating.
I had made a it's proposal that T.A.B be conducted essentially first. The proposal was gradually expanded and accepted. Eventually, 2 weeks later, the T.A.B works were run.
-25 Feb, 2017