In week 54, the final front door replaced the temporary wood panel door installed during construction. The two small trims on the garage door were finally snapped out. The exterior wall guy came back and painted the stucco base layer in the backyard. the garage door was unfortunately delayed again, which was a big disappointment. We did a phase walk with the project manager, and the interior was cleaned and all the door hardware was installed, which was a relief.