Gracefull Sea
Furnishing: furnished (basic)
Bedrooms: 2
Bathrooms: 1
Size: 25x20
Cost: 29864 §
Custom Content: roof
DOWNLOAD (.package)
untitled

Kiana Khansmith
Doug Jones

No title available
Aqua Utopia|海の底で記憶を紡ぐ
Cookie Run:Kingdom Official!
𓃗
"I'm Dorothy Gale from Kansas"
Cosimo Galluzzi
Not today Justin

pixel skylines
almost home
2025 on Tumblr: Trends That Defined the Year
$LAYYYTER

Andulka

Product Placement
d e v o n
PUT YOUR BEARD IN MY MOUTH
Xuebing Du

gracie abrams
seen from United States
seen from Bangladesh

seen from Argentina
seen from United States
seen from United States

seen from Chile
seen from Jamaica
seen from Bolivia
seen from Brazil
seen from Argentina
seen from United States

seen from United States
seen from Kenya
seen from United States

seen from United States
seen from Bangladesh
seen from United States
seen from South Africa
seen from Malaysia

seen from United States
@simsprojects
Gracefull Sea
Furnishing: furnished (basic)
Bedrooms: 2
Bathrooms: 1
Size: 25x20
Cost: 29864 §
Custom Content: roof
DOWNLOAD (.package)
An old house for my Sims’ family. Now I don’t play in it, so I’d like to share this with you very soon. "Hearth and Home" has 4 bedrooms (for two pairs of adult Sims, two children and grandma), 2 bathrooms/toilets, living room, kitchen and a little laundry. Before I’ll release it, I’m going to change some furniture inside of house, ‘cause I’m planning to use less CC objects than now is in building. Stay tuned!
A Simmers Blog
Maison des Handerson / Prescott - Part 2 | Handerson’s / Prescott’s House - Part 2
Elea et Jayson ont emménagé dans une nouvelle maison, alors voici une petite présentation de la maison en question. J’ai téléchargé la maison de départ chez fakehousesrealawesome qui fait de très belles maisons, mais que j’ai entièrement redécoré selon mes goûts.
Elea and Jayson moved into a new home, so here is a brief presentation of the house in question. I downloaded the house starting at fakehousesrealawesome (who making beautiful houses), but I completely redecorated according to my tastes.
Télécharger la maison de départ | Download starter home Bamboo Modern © Fake Houses
The Harper (3 bed, 3 bath unfurnished home)
Lot size: 25 x 30
Price: $45,679
Expansions and SPs: I have all installed to latest update.
CC:
ATS3 - Natacha’s garden boots, tile pattern
HugeLunatic MTS - closure garage door small
Mutske TSR - window planter ivy, hanging string of pearls, plant fonds and oxford private window.
Sookielee Customsims - grey slate roof with white trim
Baufive - grant park windows and doors
Apple TSR - riverblossom fencing
Gosik TSR - cottage half landing stairs and fence
Plasticbox MTS - simple siding pattern
Plum MTS - TS2 conversion wood floor and discrete concrete pattern
Note: I also use default wood replacements by JaneSamborski at MTS
Not sure about store items, hoping there is minimal to none. I HIGHLY recommend running this through CUSTARD before installing. I did try to do it before uploading but I couldn’t figure out what to remove (ok I am hopeless). Let me know if there’s any problems, knowing my crazy game there might be.
THE HARPER DOWNLOAD LINK
V02 Australian Townhouse Unfurnished ~ 969 Followers GIFT
Includes:
kitchen + dining/living
laundry
master bedroom (downstairs) + en-suite
3/4 bedrooms
study
2 bathrooms
carport
lot size: 30x20
price UF: $31,152
Notes:
Requires: patch 1.67 Base + Pets (built with all eps and sps installed)
CC is NOT included!
Bioshock Infinite Hedge - VKG
Roses - Luna
Grant Park Build Set - b5Studio
Casement Windows - Madaya74
White Trim, dark grey slate roof - Lilliebou
Victorian Porch Railings/Fence - MsBarrows
TV Antenna - Severinka
Cottage Half Landing Stairs - Gosik
Victorian Gable Top - Mutske
PC Weatherboard Walls - Simsational Designs
Soft Walls Set II - SimsInSpring
Double Door Wide Open V3 - Severinka
Patterns - ?? (2 used)
Terms of Use & Info:
Download: Sims3Pack//Package
Hi sweeties
For those of you that doesn’t know this tip already here is the thing if you have trouble running your game because of too much cc.
This is for both games.
All you have to do is rename your Sims 2/Sims 3 folder from My Documents/Ea Games or Electronic Arts that is for Sims 3 and…
Willoughby Chapel: part 1.
Many thanks to the lovely Jenba for letting me use her gorgeous gothic chapel for my cemetery lot! All credit for the chapel’s exterior and most of the interior goes to her of course!
Willoughby Chapel features a mausoleum (with secret underground passage), small pond, tower clock/groundskeepers shed, cemetery grounds and of course the chapel itself! The name was inspired by this Twilight Zone episode.
In the pond I’ve placed a deathfish spawner, and at the back of the lot you’ll find two death flower plants. I initially place a couple of fog spawners (as you can see in the night pictures), but I felt they were a bit too much during the day, so I removed them for the upload.
The lot size is 32x63 and it’s labelled as a graveyard. In Cottonwood Hills this lot is located at 2 Birch Road.
Pictures here: part 1, part 2, part 3 and part 4.
About custom content
A comprehensive list of custom and store content used is not included, any content you do not have installed will be replaced by the game. Feel free to send me WCIF’s.
I have all EP’s, SP’s and (decrappified) store content.
I use these OMSP’s: shiftable OMSP and OMSP resizers, I recommend having them installed.
Sandy’s church set is a must for this lot!
How to install
This is a package file so you need to put it in your Library folder. It will show up under community lots in your library.
TOU
Please do not claim this lot as your own or upload it to the exchange or elsewhere. Thank you.
Download (Mediafire)
State Library - WIP
43 Baleway Beach Westport
Three almost identical exterior shots because I couldn’t decide which angle I liked better. x) I also can’t won’t ever stop decorating overfilled and cluttered gardens - and I am now struggling with the urge to make an elder couple to move into this house, hnnnng.
Highland | 3 bedroom. 3 1/2 bath. Partially furnished.
EP Required: University Life
CC Required: CAST-able chimeny
Comes with both Sims3Pack and package file (to be place in your library folder). You only need to use one.
TOU: Don’t upload this anywhere else, or claim that you made it. You can change it anyway you like, but don’t upload a changed version.
Tagging ellzia on any post the house is featured in is not required but is appreciated.
Mediafire | Box
Jet-lagged simming :) I built a home in Brightwater Bay off a house plan (I think it’s Sears but I’ve lost the webpage) and moved in two sims, Alice and her grandson Alex.
My houseboat in its fifth or sixth reincarnation. This time in the absolutely beautiful Enekjaer Island by Fagersims.
A makeover of one of the condos that’s been a WIP for over a year..
I’ve been busy these past few days making homes for Elmhurst by Pixels&Company. Three down, so many more to go… But I must pursue, then I can finally start my story!
Features:
20x20 lot
Available furnished and unfurnished, both are landscaped
Loft BR + main floor BR (or office/nursery/whatever, if desired)
Open kitchen/living/dining
1 BA with laundry
Only CC is a wall set
Download:
Furnished (§50k-ish)
Unfurnished (§15k-ish)
CC Required:
Charlie Wall Set: credit to gracefulshores
I have all EPs/most SPs (except KP and Diesel)