الجزء الأول من قعدة نقاش حول مشروع تطوير ترام الرمل المثير للجدل، وشرح لما اراه من السرديات الثلاثة المسيطرة على النقاش العام، وتأثير تلك السرديات على فهم متكامل للمشكلة الجهورية للنقل في الإسكندرية واسباب استفحالها
untitled
KIROKAZE
Cookie Run:Kingdom Official!
Mike Driver

gracie abrams

titsay
Fieri Frames
Fai_Ryy

No title available

Love Begins
Today's Document

#extradirty
No title available
Cosimo Galluzzi

@theartofmadeline
d e v o n
Game of Thrones Daily
NASA
TMBGareOK. The Official They Might Be Giants tumblr

pixel skylines

seen from Poland

seen from Türkiye

seen from United States

seen from Bangladesh

seen from United States
seen from Poland

seen from United Kingdom

seen from United States
seen from United States
seen from Türkiye
seen from United States
seen from Brazil

seen from United States

seen from United States

seen from Malaysia
seen from Ecuador
seen from United States
seen from Uzbekistan
seen from Malaysia

seen from Costa Rica
@submonitor
الجزء الأول من قعدة نقاش حول مشروع تطوير ترام الرمل المثير للجدل، وشرح لما اراه من السرديات الثلاثة المسيطرة على النقاش العام، وتأثير تلك السرديات على فهم متكامل للمشكلة الجهورية للنقل في الإسكندرية واسباب استفحالها
Hey everyone!
This is a guide for public transport/transit options available for folks arriving at Cairo International Airport. This was originally made in 2022, however not much as changed in terms of the transit options available.
Once there is clarity on the Metro expansions to the airport, will post back here!
September 2025 marked the 100th anniversary of public transport buses in the city of Freiburg im Breisgau! 🎉
This is a short video marking the anniversary. Share your stories of Freiburg buses with us in the comments or feel free to write to us via our contact channels and social media!
Sources: FreiGIS StadtFreiburg (geoportal.freiburg.de) Amsblat Stadt Freiburg Openstreet maps bus bild de
التذكرة الموحدة للمواصلات في القاهرة: هل المشكلة فعلا تكنولوجية ولا...؟
في حلقة اليوم من صفحة الصبمونيتور سنتحدث عن آخر محاولات وزارة النقل المصرية ومحافظة القاهرة لعمل تذكرة موحدة لوسائل، وسنناقش لماذا تتكرر المحاولات ولكن تواجه في النهاية ذات المشكلات والمعضلات، وسأتحدث ايضا عن الأمثلة الدولية في هذا الخصوص وأقترح حلول قد تناسب القاهرة الكبرى بتعقيداتها وتركيبتها الفريدة.
Mwasalat Misr's M10 Bus: good service is not difficult to achieve!
Oh, the joy of finding a bus, that works! A bus that exceeds the expectation! These are words that I have never thought would cross my mind when talking about a public transport bus experience in Cairo. The brief ride straddling along the 26th of July corridor, on a path to the 6th of October city. Why can't all buses just be like that?
Then comes along the feelings of defeat, as I remember how I got on to the bus, how I had to disembark, and how I had to find the bus taking me back to central Cairo. This, all in all, summarises my experience talking Mwasalat misr buses from Zamalek to 6th of October city and then back to Cairo. Starting with my journey planning attempts, I was not able to use the Mwasalat misr app to find my trip. For some reason, using the app doesn't help get me accurate results. Luckily for me, that particular Mwasalat Misr route shows up on the Google Maps App using its Transit feature. Moving from Zööba in Zamalek, Google Maps tells me that I need to walk up to the 15th of May bridge between Zamalek and Agouza. I know from memory, that some buses do not enter Zamalek via 26th of July street, and instead zip along the 26th of July Axis. I was surprised to find that part of the bridge had been lately expanded but then I was pleasantly surprised to find that the side-walk was kept within a similar width. However, what I noticed next was a new experience for me: a person who is used to taking public transport buses in Cairo and globally. Dozens of other passengers, if not more, were waiting between the most right lane and the 3rd lane from the right. Standing in the middle of the road, cars were seemingly aware of their presence as if they were used to this scene. Buses and microbuses of all kinds are stopping in front of this gathering of people. What is very clear is that this is a bus stop that has been created by demand and the constraints of urban geography. I waited among those people, protected by our sheer numbers as cars whizzed by. Not long afterward, came my bus: the M10 heading to the 6th of October city. It was a bit of a struggle to try and get onto the bus, as it was dodging other buses that wanted to stop as well. Finally, I made it on, and with my Mwasalat Misr card, payment was a piece of cake. Then began my easy and relatively smooth ride to my destination. I kept the navigation and trip tracking on my Google Maps app, in order to know how far I was on this route and prepare myself in time to get off the bus. What was initially an attempt to try out Mwasalat misr buses, almost 7 years after their major debut in 2018, ended up proving to be the most salient choice that evening.
We were being held up by traffic, mostly stop-and-go, and I wondered if I had been in an Uber, how much would the trip now cost, as it counts all of that idling and bumper-to-bumper traffic. Not to mention comfort. I was sitting in a seat with plenty of legroom, in a well-lit bus, in a comfortable chair, reading a book, rather than being crammed in a random person's car trying to avoid unnecessary small talk. This, ought to be the experience of a semi-decent public transport bus. As all things do, my destination is approaching, and it has become clear that I need to get off the bus. It proved much trickier than I thought as I had to try to communicate that I wanted to get off at the closest stop to Arkan Plaza, on the edges of Sheikh Zayed city. Luckily, I was dropped off close to the point showing up on Google Maps, commencing my commute to the plaza. As with the stop I got on from earlier, there are no signs or indications that this is a bus stop, other than the fact that soon thereafter people gathered to try to catch other buses from that stop. I walk to the Plaza for my errands. A few hours later, I decided to take the bus back to central Cairo. This was in December 2024, and the Nile West Monorail was still under construction. Therefore, crossing to the other side of the road was a precarious matter as, notwithstanding the wide road and speeding traffic, the road median was part of the construction site and was not easily passable, especially at night. I decided to take any Mwasalat misr bus that showed up, go to the end of the line at El-Hosary Square, and change there to the other direction. As this was late in the evening, and there were fewer passengers, the driver asked me where I was heading . I told him that I wanted to change to the bus heading to Abdelmoniem Riad Square in central Cairo. This happened as the bus was driving by another Mwasalat Misr, and the happy coincidence: was that the bus was heading to central Cairo. I changed buses, and as with my earlier journey, it was a comfortable and easy ride. It was even faster as by now there was less traffic. The ride experience exhibited in these trips is, what I believe to be, the basic and most essential experience that should be the norm or the standard on public transport buses in general. As for the unfavorable aspects: - the street infrastructure that service buses (such as bus stops and shelters, signs and dedicated lanes) are in dire need of attention. We don't have to spend millions of pounds to achieve the needed impact: what is needed is a policy standard that is then generalized across the network, adapted to the local situation if need be, and accessible to the commuters (well-lit bus shelters (at night) that are also shaded (during the day), that have bilingual signs showing the direction of travel, bus routes, local street plan, clean seats, etc). - Mwasalat Misr needs to continue supplying its transit info to Google Maps and keep it up to date. Not everyone can download the app, either due to space reasons or app store restrictions (my app store is geo-restricted in the EU, for example). If possible, they should post schedules at bus stops, even if laminated A4 printouts are glued on a wall or some makeshift street sign. In conclusion, this was a good trip, and using Mwasalat misr on the M10 route was, despite the dire situation of the bus stops, a good decision after all.
Dear Patrons,
Five years ago I made the decision to create The SUbMonitor. I felt it was extremely important to have a platform that talks about mobility and urbanism from a different perspective.
Today, it feels even more relevant to have such a space. In a world where much of the urban/mobility discussion takes place among the most knowledgeable experts, it feels like little effort has been made to reach out to the general public.
My article on Cairo's West Monorail (in Arabic) and my attempts to map Amman's BRT bus routes have proven to be some of the most popular content I have ever published on this platform. However, the most significant piece to date has been my article on the flyovers/bridges of Heliopolis, which received such attention that requests to translate and publish the article in Arabic were quite common, and thankfully found great support from colleagues like Abdelrahman Hegazy to translate this piece into Arabic.
After five years of starting The SUbMonitor, and despite all the personal and professional ups and downs in my life, having such a stable income and support from you, dear patrons, has helped me to always remember that my work is wanted and that there are people who find the public spaces to discuss issues related to cities and their transportation systems valuable to people. For creators like myself, it can sometimes feel like it's a wilderness out there, and that only consultants and interest groups dominate the discussion of these issues.
But thanks to your continued support, we are still here!
In the coming weeks I will be focusing on regional transportation systems in southwest Germany. I am also currently working on a follow up to talk about the East Monorail in Cairo and inter-connectivity with points of interest and other modal transfers.
You are also invited to share your thoughts and suggest new ideas and topics. Please feel free to post your comments below or reach out to us via the page at www.facebook.com/thesubmonitor/.
Thanks again for your support and I look forward to another 5 years of The SUbMonitor!
التبادلية اساس: تقييم (تقريبي وسطحي) لمدى تبادلية محطات خط مونوريل غرب النيل
صورة لمحطة مونوريل جهاز اكتوبر - الحصرى تظهر تقدم الأعمال بها. المصدر: صفحة شبكة القطارات المصرية، تاريخ: 18 أغسطس 2024.
على الرغم من أن إنشاءات خط مونوريل غرب النيل لم تكتمل بعد إلا أن أعمال الإنشاء تقدمت بشكلٍ كافي يسمح لنا بتقييم مدى تبادلية الخدمة بين محطات مونوريل غرب النيل و باقي المرافق الحيوية خاصة وسائل النقل العام بالقاهرة الكبرى، والمقصود بالتبدالية هنا هو حساب المسافة بين مبنى محطة المونوريل والمرفق أو وسيلة النقل الأخرى وسهولة الانتقال سيرا على الأقدام بينهما.
خريطة مسار مونوريل غرب النيل. المصدر: صفحة شبكة القطارات المصرية، تاريخ: 26 مارس 2023.
هناك عدة اشياء يجب إيضاحها اولا:
الافتراض الأساسي هنا هو قياس المسافة التقريبي بالأمتار بين أقرب نقاط من طرف المحطة إلى أقرب طرف من المحطة الأخرى بناء على تطبيقات الخرائط مثل جووجل، ولا نستطيع هنا الجزم بشكل مؤكد المسافة بدقة ومدى ملائمة الارصفة واماكن سير المشاة بين المحطات.
المفهوم الأشمل التبادلية يتضمن عوامل اخرى مثل تنسيق جداول الرحلات بين وسائل النقل المختلفة وسهولة تنسيق معلومات الركاب بين هذه الوسائل، بالإضافة لتبادلية أنظمة التذاكر والتعريفة، وبما أن هذه العوامل لا يمكن الجزم بها هنا كمان انه لا يوجد بالقاهرة الكبرى - حتى كتابة هذه الكلمات - ائتلاف تعريفي أو منظومة تذاكر موحدة تشمل كل أو أغلب وسائل النقل العام، فالحديث هنا عن التبادل من منطلق سهولة الانتقال من وسيلة الى أخرى من حيث مسافة المشي والوقت المتوقع للمشي بين محطة وأخرى فقط.
نفترض هنا أن معدل سرعة المشي هو ١.٣ متر في الثانية وهو رقم افتراضي لمعدل سرعة المشي وليس رقم ثابت حيث أن بعض الأشخاص يستطيعون السير بسرعة أكبر من الآخرين أو بعض ذوي الهمم أو أشخاص لديهم كسور أو حالة صحية تؤثر على قدرتهم على المشي أصلا. هدف الرقم المعلن هنا هو محاولة لحساب المدة التقريبية للمشي بين وسيلة وأخرى.
مشروع إنشاء المونوريل لم ينتهي بعد ونحن لسنا بصدد مراجعة نجاح المشروع من عدمه ولكن نبني توقعاتنا بناء على ما تم انجازه فعلا من المشروع، ومن المهم أيضا الإشارة إلى ان هذا المقال لن يتطرق لمدى ملائمة تكنولوجيا المونوريل لمثل هكذا مشروع من عدمه ولكننا نسعى للتركيز على تبادلية الخدمة بين المونوريل والوسائل الأخرى.
التقييم سيكون إما ممتاز أو جيد جدا أو جيد أو مقبول. في حالة مونوريل غرب النيل لا توجد اي حالة فاشلة لحسن الحظ، حيث ان اقل تقييم هو "مقبول". يكون التقييم "ممتاز" إذا كانت المسافة بين المحطة والأخرى لا يتجاوز دقيقة واحدة أو أن الخدمة المتبادلة داخل ذات المحطة (مثل محطة عدلي منصور والتي يتبادل الخط ٣ والقطار الخفيف الخدمة فيها). أما "جيد جدا" اذا كانت المسافة بين ٧٥ و ٢٠٠ متر أو بين دقيقة ودقيقتين ونصف مشيا تقريبا، وجيد إذا كانت المسافة بين ٢٠٠ الى ٥٠٠ متر (بين دقيقتين ونصف و٦ دقائق تقريبا)، وتكون "مقبول" إذا كانت المسافة بين ٥٠٠ متر و١٠٠٠ متر / أي كم ١ (بين ٦ دقائق ونصف و ١٣ دقيقة تقريبا).
المسافة المحسوبة لا تشمل المسافة داخل المحطات من باب المحطة لشباك التذاكر والرصيف.
حسب الخرائط الرسمية توجد ٤ محطات تبادلية مخطط لها:
١- محطة مترو وادي النيل وهي أيضا نقطة انطلاق خط مونوريل غرب النيل،
٢- محطة قطارات صعيد مصر / بشتيل
٣- الأوتوبيس الترددي - الطريق الدائري
٤- محطة مونوريل نقابة المهندسين - محطة ٦ أكتوبر للقطار السريع.
بالإضافة لهذه النقاط التبادلية الرسمية توجد ايضا ثلاث نقاط تبادلية محتملة:
٥- محطة مونوريل الشيخ زايد،
٦- محطة طريق الإسكندرية،
٧- محطة جهاز ٦ أكتوبر - الحصري.
تقييم المحطات التبادلية المخططة:
١- مترو وادي النيل - التقييم (جيد جدا) المسافة: ٢٥٠ مترًا تقريبا - الزمن المتوقع للمشي: ٣ دقائق و٢٠ ثانية.
خريطة على تطبيق خرائط جووجل توضح المسار بين محطتي مونوريل ومترو وادي النيل. الرسم من قبل المؤلف. تاريخ الصورة: 03 سبتمبر 2024.
على الرغم من أن محطة مونوريل غرب النيل لا تزال تحت الإنشاء إلا أن موقع المحطة ظاهر على تطبيق جوجل، بقياس المسافة التقريبية بين محطة المترو وادي النيل ومحطة مونوريل وادي النيل تتضح ان المسافة التقريبية هي 250 مترا أي أن زمن المشي المتوقع من باب محطة المترو الى باب محطة المونوريل ستكون 3 دقائق و20 ثانية تقريبا، بالتالي فإن تقييم تبادلية محطة مونوريل وادي النيل هي "جيد جدا".
٢- محطة قطارات صعيد مصر / بشتيل (جيد جدا / غير معروف)
المسافة ٢٥٠ متر تقريبا (في خط مستقيم وليست المسافة الجيوديسية).
للأسف لم أستطيع ان استشف أقرب نقطة فعلية يمكن للركاب للولوج منها بين المحطتين ولكن برسم خط مستقيم من مجسم المحطتين تكون المسافة ٢٥٠ مترًا تقريبا، مما يضعها في التقييم: "جيد جدا".
خريطة على تطبيق خرائط جووجل توضح المسار بين محطة قطارات صعيد مصر و مونوريل بشتيل. الرسم من قبل المؤلف. تاريخ الصورة: 03 سبتمبر 2024.
٣- محطة الباص الترددي / مدخل محور ٢٦ يوليو (غير معروف)
لم أستطيع تقييم التبادلية بين المحطتين حيث ان محطة الباص الترددي في تلك المنطقة لم تظهر بعد على خرائط جووجل.
٤- محطة مونوريل نقابة المهندسين / محطة قطار ٦ أكتوبر السريع (مقبول)
المسافة: 790 متر (تقريبا)
خريطة على تطبيق خرائط جوجل توضح المسار بين محطة قطارات 6 أكتوبر السريعة و محطة مونوريل نقابة المهندسين. الرسم من قبل المؤلف. تاريخ الصورة: 03 سبتمبر 2024.
في رأيي، أعتقد أن المسافة بين المحطتين تعتبر كبيرة عندما للتبديل بينهما ولكن ولحسن الحظ فإن المسافة سيرا على الأقدام تتراوح بين 790 او 890 متر حسب التخطيط النهائي للأرصفة بعد الانتهاء من الإنشاءات. ولذلك - من وجهة نظري - أظن أنه من الأفضل إنشاء أرصفة على خط المونوريل في أقرب نقطة من تقاطعه مع خط السكة الحديد السريعة بل ويمكن ربط أرصفة المونوريل بجسم محطة السكة الحديد بشكل مباشر بدلا من بناء محطة مونوريل جديدة بحيث يتم خفض التكلفة وتشترك المحطتان في المرافق والمحلات، فلا يوجد داعي لعمل مخرج رسمي لأرصفة المونوريل المقترحة إلى سطح الشارع بما أنه توجد محطة مونوريل أخرى قريبة.
أحيانا - خصوصا في منطقة متروبولية ديناميكية مثل القاهرة الكبرى - تكون أفضل النقاط التبادلية في منظومة النقل العام هي الأماكن التي لم يتم أخذها في الحسبان، على الأقل بشكل معلن، ولذلك سأقوم هنا بتقييم المحطات التبادلية الغير مدرجة رسميًا ايضًا:
٥- محطة مونوريل الشيخ زايد (جيد جدًا)
المسافة: 180 متر
خريطة على تطبيق خرائط جوجل توضح المسار بين موقف الشيخ زايد-هايبر وان و محطة مونوريل الشيخ زايد. الرسم من قبل المؤلف. تاريخ الصورة: 03 سبتمبر 2024.
محطة مونوريل الشيخ زايد لا تبعد أكثر من 180 مترا سيرا من موقف مركبات السرفيس / الميكروباص أمام هايبر-وان، بذلك يسهل تبادل الخدمة بين مونوريل غرب النيل مع السرفيس الداخلي لمدينة الشيخ زايد وأي خدمات نقل جماعي تنطلق من ذات الموقف. كما انه يوجد موقف/جراج قائم بالفعل للمركبات الخاصة.
٦- محطة طريق الإسكندرية، (جيد جدًا)
المسافة: 170 متر
خريطة على تطبيق خرائط جوجل توضح المسار بين موقف المحور/ط. إسكندرية و محطة ط. إسكندرية. الرسم من قبل المؤلف. تاريخ الصورة: 03 سبتمبر 2024.
لأول وهلة كنت أظن أن موقع المحطة غير موفق خاصة أنه لم يعلن عنها كمحطة تبادلية، ولكن بالنظر الى فيديوهات ومن بعدها على خرائط جووجل أدركت أن موقع المحطة قريب جدا من موقف ميكروباصات / مركبات السرفيس عند تقاطع محور 26 يوليو مع طريق الإسكندرية الصحراوي ( طريق سريع رقم 75 / M75)، حيث لا تتجاوز المسافة 170 مترًا تقريبًا سيرًا على الأقدام، حيث يمكن للمشاة السير أسفل كوبري المحور على المسار الموجود بالفعل.
٧- محطة جهاز ٦ أكتوبر - الحصري. (ممتاز / جيد)
المسافة (ميدان ومحطة أتوبيسات ماجدة): أقل من 36 متر- ممتاز،
المسافة (ميدان الحصري): 361 متر - جيد،
المسافة (موقف سرفيس/ميكروباصات مندولين): 405 مترًا - جيد،
المسافة (موقف سرفيس/ميكروباصات الحصري): 950 مترًا - مقبول،
خريطة على تطبيق خرائط جوجل توضح المسارات بين المواقف والميادين القريبة و محطة جهاز أكتوبر - الحصري. الرسم من قبل المؤلف. تاريخ الصورة: 03 سبتمبر 2024.
على الرغم من أن المحطة لا تتبادل الخدمة بشكل رسمي مع موقف ميكروباصات 6 أكتوبر - الذي يبعد كيلومتر من المحطة تقريبا - إلا إن المحطة تقبع داخل أحد أكثر الأماكن كثافة وتبادلا لكافة الخدمات سواء النقل العام او السرفيس أو فقط كون المنطقة حيوية ومنطقة تجارية سكنية تعليمية بشكل عام، يمر في ميدان ماجدة عدد لا بأس به من أتوبيسات هيئة النقل العام بالقاهرة والسرفيس، وميدان الحصري وموقف مندولين لا يبعد عن المحطة أكثر من 410 مترًا، مما يجعل محطة مونوريل الحصري أحد أكثر محطات المونوريل حيوية وأعتقد أنها ستكون من أهم محطات مونوريل غرب النيل فقط بحسابات حيوية المنطقة وكثافتها.
خلاصة، ما رأيكم في هذا التقييم؟ هل تعتقدون ان هناك نقاط اخرى تبادلية على هذا الخط لم التفت لها؟ شاركوا ارائكم في التعليقات واذا اعجبكم المقال شاركوه مع اصدقائكم على وسائل التواصل الاجتماعي.
ما الذي نفقده عندما لا يأتي الأوتوبيس
بعد 2011 تغير مسار خط أوتوبيس هيئة النقل العام بالقاهرة رقم 401 ليتم دمجه مع ميني باص 108 (المتجه لجامعة القاهرة) ثم يتحول مساره ليسير في منطقة الهضبة الوسطى عوضا عن المرور في شارع 9 بمنطقة الهضبة العليا بالمقطم، ورغم أن الخط الآن بخدم منطقة أخرى من المقطم ولم يلغى مثلا، ولكن المنطقة التي يقوم بخدمتها الآن يمر عليها بالفعل ما لا يقل عن 3 خطوط أخرى تسلك ذات المسار في المار من السبعين فدان والجامعة الحديثة، بينما لا يعمل على طول ش9 سوا مركبات السرفيس أو الميكروباصات المتجهة لميدان السيدة عائشة.
ورغم ان الاسباب التي قيل انها السبب وراء تعديل المسار -وهو ضيق شارع ٩ وصعوبة وانحدارات مطلع المقطم عند شارع صلاح سالم؛ الا ان شارع 9 تم توسعته مؤخرا وتم ايضا تمهيد مطلع المقطم جهة صلاح سالم والاوتوستراد واضافة منزل مثل كوبري طه حسين بحيث ان اي اوتوبيس يستطيع ان يسلك هذا المسار الآن بشكل آمن، الا انه لايزال خط 401 يسير في الاتجاه الخاطئ وكأنه خاصم للأبد شارع 9 والهضبة العليا برمتها.
وبينما حالة اوتوبيس ٤٠١ وميني باص 108 حالات في ظاهرها فردي ولكن ترى ما الذي نفقده كمجتمع عندما لا يأتي الأوتوبيس كعادته ذات صباح؟ ماذا يحدث عندما تنحصر اختيارات قاطني حي في الاعتماد الكامل على مركبات السرفيس او التاكسي والمركبات الخاصة؟
كان ميني باص 108 يخدم سكان ش9 الراغبين في الذهاب الى ماهو ابعد من ميدان السيدة عائشة، وهي اقرب نقطة تجمع للمواصلات العامة للمقطم- فكان يمر الميني باص بمجرى العيون والقصر العيني والمنيل وكان وصلة هامة لطلبة جامعة القاهرة بالهضبة العليا، فلم اركب الميني باص 108 في حياتي الا وكان ممتلئ عن آخره اكاد اجد فيه مكانا للوقوف، دليلا على مدى شعبية هذا الخط،
فبدمج المساران وتحويلهما إلى منطقة أخرى فقدت الهضبة العليا شريان حياة للطلبة وموظفين وموظفات وجدوا أنفسهم فجأة دون خط هيئة نقل عام يخدمهم ودون توفير اي بديل من ذات الفئة، فأصبح لزاما على السكان أما التنقل بالمركبات الخاصة أو أخذ ميكروباص تلو الآخر والتبديل عند ميدان السيدة عائشة.
لعل ما فقدناه ايضا هو الضمانة بأن في مواقيت العمل الرسمية لهيئة النقل العام سيمر اوتوبيس مرة كل 10 دقائق -او نصف ساعة حتى- دون القلق من عدم وجود مكان على الميكروباصات او في حالة عدم تواترها في ساعات الصباح الباكر مثلا.
هذه الضمانة هي التي تجعل خطوط المترو الكثيفة الخدمات أعمدة رئيسية لشبكة النقل العام في إقليم القاهرة الكبرى، ومحصلة كل خطوط المترو والمونوريل (تحت الإنشاء) والقطار الخفيف وخطوط الاوتوبيسات والميني باص انها خدمات نقل عام مجدولة، إذا توفرت بها العدد الكافي من المركبات فانها قادرة على إنفاذ ضمان لكل السكان وهو وجود وسائل نقل عام تعمل وفق جدول ما، دون انتظار ان يكتمل عدد الراكبين في مركبة مثل الميكروباص حتى يحقق سائق المركبة العائد الذي يحتاجه لتغطية تكلفة الرحلة والكارتات وما يتبقى منه يقتات عليه.
واريد أن أؤكد هنا أنني لست بصدد المطالبة بالاستغناء عن السرفيس والميكروباصات -الذي هو المغذي الأساسي لشبكة النقل العام بالقاهرة الكبرى- بل انني اظن ان القاهرة واحيائها تحتاج لأنماط متعددة تعمل جنبا الى جنب ومتقاطعة مع بعضها البعض لتحقيق هدف هام وأسمى وهو ان تصبح القاهرة الكبرى مدينة يستطيع سكانها وزائريها على السواء التنقل بها بإستذخام وسائل النقل العام بشكل مريح وسلس دون الحاجة للاعتماد الكامل على النقل بالمركبات الخاصة والتاكسي أو تطبيقات النقل التشاركي، فلتلك الوسائل ايضا زبائن خاصة واناس بحاجة لها لظرف ما، ولكن لا يجب ان تعتمد أي مدينة كبيرة الحجم مثل القاهرة فقط على السيارات الخاصة والتاكسي وما في حكمها.
مصدر صورة الغلاف: جريدة المصري اليوم
Op-ed: Finally high speed? Egypt’s Long awaited HSR Line 1.
One of the most important projects in Egypt to date, albeit requiring (some) urgent extensions to fulfill its potential.
Picture 1: Rendering of the new HSR trains from Siemens press relase, date 28th of May 2022. (Source: Siemens)
An important disclaimer needs to be made: the analysis made here is arm–chair planning. While I am confident enough to publish this piece, this is neither a report nor is it academic. However, I think it is important to raise questions and put forward policy proposals to help make good transit even better. Also any sources used will be either hyperlinked or attached as a PDF.
Egypt’s High-Speed Railway projects provide genuine reasons for optimism. This opinion piece focuses on the High-Speed Railway (HSR) Line 1, which will run from Marsa Matrouh to Ain Sokhna, via West Alexandria and Greater Cairo.
According to the National Authority for Tunnels (NAT), the national agency responsible for the construction of HSR 1, along with Siemens Egypt, the high-speed “express“ trains which will consist of Valero trainsets (akin to Germany’s ICE trains) will reach a top speed of ca. 230 km/h. The “regional” trains will be based on Desiro trainsets (which are akin to Germany’s Regiobahn/ regional trains), which will run at a top speed of ca. 160 km/h.
For reference, the Cairo-Alexandria railway corridor is ca. 200 km. Due to the current conditions of the legacy railway mainline (run by Egypt National Railways - ENR) and factoring in the other stops in between, the train ride between Cairo and Alexandria takes around 3 hours. For other express trains on the line, such as the new Talgo trains, that journey could take up to 2 hours and 30 minutes. The Talgo trains have a top speed of 160 km/h but due to the stops and the conditions of some of the railway segment, the average speed is 80 km/h.
Picture 2: Screenshot showing the average time and distance between Cairo and Alexandria. Notice duratiom difference between Train 2025 (a Talgo train) and 901 a regular “speed” train (Source: ENR official booking website).
With HSR 1, there will be an alternative train route from Cairo to Alexandria (via the area adjacent to the Cairo-Alex Desert Road) that runs on dedicated high speed railway tracks, and will connect Cairo to the North Coast area; the latter only serviced at the moment by a low-frequency legacy single track that runs from Alexandria to Marsa Matrouh. The railway line as it is currently planned, is already going to be a great addition to the Egyptian transport network.
However, some issues can hinder achieving the potential this HSR line has for commuters and travelers alike. Those issues include the distance between the Cairo HSR stations and the nearest urban agglemoration or metro station. Also, many missed opportunities to connect important facilities and areas within the vincinity of the new HSR. Implementing solutions to close these gaps will be a change changer for sustainable mobility in Egypt and would be a good step forward in encouraging the transition to sustainable mobility across the Middle East and North Africa.
What is HSR 1?
Picture 3: An official map of the HSR Line 1. Stations in green are designated as “Regional” and those in orange are “Express” stations. (Source: National Authority of Tunnels (NAT), Egypt)
The Line begins from Marsa Matrouh on the western end of Egypt’s Mediterranean North Coast, passing by the North Coast towns and cities until Alexandria, then heading to the Greater Cairo Region, passing by the further most western parts of the Nile Delta, before it crosses over the Nile, encircling Giza and Cairo proper, then passes by the outermost outskirts of New Cairo and the New Capital, before terminating at Ain Sokhna on Egypt’s Red Sea. It is, so far, the only direct true RED2MED (Red Sea to Mediterranean Sea) rail link in existence. In addition, there is a planned short link to the Fayoum, south of Giza.
Here is a list of the railway stations along the line:
Legend:
LRT: Light Rail Transit
NAC: New Administrative Capital
HSR: High-Speed Rail
→: Branch off the mainline.
Express: Serviced mainly by Valero trainsets.
Regional: Serviced mainly by Desiro trainsets.
Table 1: A list of the stations and their planned intermodality. (Source: Own work)
One of the issues noticed, from analyzing the information provided online and in the media, and by having a look at Google Earth's latest imagery, one finds that the moment the railway bends away from the North Coast towards Greater Cairo, we start seeing missing connections and gaps.
Below is a breakdown of the issues that I believe are a hinderance to achieving a higher future revenue and utilization of the HSR line 1.
Borg ElArab Int. Airport: passing by but not stopping?
Picture 4: Borg ElArab airport, the only civilian airport that currently serves Alexandria and Borg ElArab area. It also is popular with budget airline travelers, including those heading to Giza and Cairo. (Source: felekmaster, wikimedia).
That didn’t matter much as the railway service on the legacy route served the rural hinterland of the North Coast, and the capacity of the legacy rails there prevented increasing services that could have been useful to the airport.
The North coast section of HSR 1 goes parallel to the legacy railway line from Marsa Matrouh until the town of Borg ElArab, after which it diverges into two sections: a section going to Alexandria in the East, and a section that is the continuation of the main HSR line heading southeast. It disturbingly passes by the Airport perimeter, on both its North and East sides, without having a single station or set of tracks heading to the Passenger Terminal.
This will prove crucial in the future, as Borg ElArab airport is set to expand even further and a second passenger terminal, leading to increased traffic in the area.
Picture 5: Brochure by Japan Airport Consultants, retrieved from the Engineering Consultants Group SA’s website , detailing the planned expansion of Borg ElArab Airport and Terminal 2’s capacity. (Source: ECGSA.com)
Sadat City station: a tad out of reach?
The station dedicated to Sadat City, a sprawling new town northwest of Cairo, is not directly adjacent to any of the city’s main districts or even close to the city limits. This issue could have been prevented had the station’s location moved around 2 km North West, where it would have been at a nearer location to the city limits. Just moving the station 2 km in that direction makes it easier for those commuting to and from Sadat City to access the HSR line.
Picture 6: Sadat city HSR is ca. 2 km, as the crow flies, from the city limits (shown on maps as dotted red line) of the city it aims to serve. (Source: Google Maps)
Sphinx Airport and Smart Village: why not?
Between Sphinx and 6th of October city, there is a wide gap without a railway station (neither express nor regional) despite the HSR 1 mainline passing by yet not serving Sphinx International Airport (Cairo’s 2nd International airport), Smart Village (a business park with many financial and telecommunications corporations) and AbuRawash Industrial area.
6th of October City: an oversight in need of correcting!
Despite its importance as a major inter-modal node with the Monorail West line, and being in the heart of a major metropolitan area like 6th of October city, it’s currently designated as a “Regional” only station. This obviously needs to change.
Picture 8: Screenshot of the October Gardens station from Google Earth (Source: Own work using Google Earth)
Although the nearby station “October Gardens/Hadayek October” is planned to be an intermodal station for lines 1 and 2, it is far more logical and far more efficient and revenue minded to either designate the 6th of October station as the intermodal station between HSR 1 and 2, since the area around the station is already built up and central to the 6th of October city. Also, the Monorail West line station is nearby, therefore connecting to other parts of 6th of October city and Giza.
Picture 9: Screenshot of the 6th of October station from Google Earth (Source: Own work using Google Earth)
South Giza: Blocked path?
The new South Giza HSR station is being built on the path of the former railway curve leading from the ENR mainline to the Wahat line. Instead of keeping the railway curve and utilizing it within the station as a potential for quick platform change station, and possibly a cheaper way to connect the HSR to the mainline in the future, the tracks were removed, and station was built atop it.
Picture 10: Screenshot of the South Giza area before the start of the HSR construction works, from Google Earth (Source: Own work using Google Earth)
Pictures 11 and 12: Screenshot of the South Giza new HSR and ENR multimodal station. See how a new railway station is being built atop the now demolished Giza-Wahat railway curve. (Source: Own work using Google Earth)
South Cairo/Helwan HSR: A bit far?
Despite being the only HSR station that is within the city limits of Cairo proper, it is by far the farthest station of all to central Cairo. It will be a great service to the residents of Helwan, of course, and that is a positive aspect. However, the Helwan Metro station is a Kopf Bahnhof/ Terminus station, meaning an expansion of the line 1 metro to meet the new railway will be unfortunately out of the question in the foreseeable future.
The closeness of the often overlooked Marazeq bridge, on the other hand, might come to the HSR’s rescue.
Pictures 13 and 14: Screenshots from Google Maps, with live traffic view, showing how long it would take to travel from Downtown Cairo to the Helwan HSR on an average weekday at 6:15 pm Cairo time (06/02/2024). (Source: Google Maps).
Picture 15: Screenshot of the Helwan Metro terminal station from Google Earth (Source: Google Earth).
Picture 16: Screenshot of Google Maps, with live traffic view, showing how long it would take to travel from the nearest metro station (Helwan) to the new HSR station in South Helwan, on an average weekday at 6:30 pm Cairo time (06/02/2024). (Source: Google Maps).
Mohamed Nagiub's New Cairo station: not even close.
This HSR station is supposed to serve New Cairo and is named after one of its main avenues (Mohamed Nagiub axis). The station lies 9 km south of the current southern limits of New Cairo city. The area around the station definitely has potential for transit-oriented development/ small rail town, being in the desert and not surrounded by any other development or agricultural works except by a powerline and a highway.
Picture 17: Screenshot of Google Earth’s ruler feature to measure the road path from the new Mohamed Nagiub HSR station to the nearest ‘edge’ of New Cairo. The distance from the station to the nearest New Cairo proper residential area is ca. 9 km. Marakez is closer but is still some 6 km away from the station. (Source: Google Earth)
Picture 18: Screenshot from Google Earth showing the new Mohamed Nagiub HSR station being constructed and its surroundings. Sat image dated 5/4/2023. (Source: Google Earth)
What can be done to fix HSR Line 1?
Picture 19: Can Egypt’s future Express trains be as successful and popular as its German ICE counterpart? The door is open to make that happen now, while construction works are still underway.
(Source: Flickr.d5e via Wikimedia Commons, CC4.0 license. Photo description: Center coach with open door of Deutsche Bahn, BR 412 ICE 4 train, heading to Frankfurt Main, Süd, taken in Berlin Ostbahnhof)
1-: Changing the designation of certain stations to "Express railway"
Starting from the cheapest of interventions to fix the HSR 1, the following stations need to be immediately designated as dual-use stations (both express and regional trains) or as half-express (fewer Express trains/more regional trains): Burg AlARab/Borg ElArab, 6th of October City, South Giza, Mohamed Nagiub.
Cost: Zero.
How:
A schedule that differentiates between Sprinter trains that don’t stop at smaller stations. The remaining Express trains can stop at an alternate set of stations. Hence, keeping the number of extra stops low and the duration of the journey manageable. eg. Sprinter trains to stop only at the main Express station. Then have the configuration of trains, that stop either at all express stations, then stop at 6th of October city, then Mohamed Nagiub. The alternating configuration could then stop at express stations, plus Borg ElArab, and South Giza.
Even though these regional stations are not getting full express train service, having at least these alternating services will make it easier for folks to plan their commutes around express trains if they need to, and use the regional trains if they want to spontaneously or to travel a few stations up or down the line.
Tip: DB already does this on many of its routes in Germany.
2- Closing the HSR and ENR gap: ENR Legacy - HSR link via Marazeq bridge
Build 1 km of new rails from West of South Cairo station to the Marazeek cargo line, repair and increase the efficiency of 6.85 km of existing railway. This includes the cargo route and the Marazeek bridge (the 2nd railway bridge in the North of Cairo, but lesser known and forgotten except by Egyptian railfans like myself).
Picture 20: A photo, dated sometime in 2020, of a Henschel 3096 Diesel ENR Locomotive, going over the Marazeek Bridge. Al Marazeek bridge is a multimodal bridge (single railway track, 2 lane roadway and a pedestrian path). (Source: User “Na Na” - Google Maps)
From here we have two solutions:
2-a- least cost possible: Run Bi-mode EDMUs (like the British Rail Class 802). These trains can run on both diesel and electrical overhead wires. This would be crucial to help bridge the gap between the ENR and HSR: The class 802 can run on diesel from Cairo Central station in Ramsis Square all the way to the South Cairo/Helwan station, then switch to the electrical overhead power supply on the rest of its journey along the HSR.
Picture 21: The British Rail Class 802 Trainset, a Bi-mode EDMU trainset manufactured by Hitaschi, operated by the Great Western Railway of the UK. These trains can run on both diesel and when available, use an overhead electric powerline. (Source: Superalbs via Wikimedia Commons, CC4.0 License)
Using bi-mode trains will allow for these routes to be possible:
Cairo central to West Alex
Cairo central to North Coast and Matrouh
Cairo central to New Cairo (see solution 3)
Cairo Central to the New Capital
Cairo is central to Sphinx and Borg ElArab Airports (see solution 3)
Cairo central to Ain Sokhna
Pictures 22, 23, and 24: Maps of proposed ENR-HSR Rail-link in the Greater Cairo region (Source: Own work using Google Earth).
2-b- the future-proof yet costlier option: electrify the gap from South Cairo/Helwan to Cairo central station. This would guarantee that all of the HSR trains can enter Central Cairo and would not require the Rail Class 802 units.
How did I calculate the costs:
It’s not entirely clear how much 1 km of electrified rail costs in Egypt. However, the entire 660 km of rails, signaling systems, compensations paid, stations and the train sets cost about 4.5 billion euros.
Now if we make the very prejudiced assumption - based on the study “Economic investigation for building a high-speed rail in developing countries: The case of Egypt” by Belal et. al 2020 - that the actual Infrastructure (rails and overhead wiring etc) costs only 15% of the 4.5 billion, that means, (4.5 billion € /660 km+all stations and facilities)*0.15= 1 million € per km of rails and overhead wires.
Also, assuming that the rehabilitation of existing railways costs a third of placing a completely new set of tracks, that means rehabilitation of rails costs 333 thousand euros per km. Let’s assume that the electrification costs of existing rails costs also 333 k.
Cost of 2-A plan:
1 km of new rails: 1 million euros
7 km of rehabilitation of the existing tracks: 330 thousand x 7 km = 2.3 million Euros
Total: 3.3 million euros
Percentage of this plan to the main project expenses: 0.07 percent of the total project cost (i.e. peanuts!).
Cost of 2-B plan:
1 km of new rails: 700 thousand euros
7 km of rehabilitation of the existing tracks: 300 thousand x 7 km = 2.1 million Euros
Total: 2.8 million euros
Percentage of this plan to the main project expenses: 0.06 percent of the total project cost (i.e. peanuts!).
Cost of 2-B plan:
1 km of new rails: 700 thousand euros
7 km of rehabilitation and electrifying existing tracks: 666 thousand euros 00x 7 km = 4.6 million Euros
38 km of electrifying existing tracks (from Marazeek to Cairo Central) = 12.6 million Euros.
Total: 17.2 million euros
Percentage of this plan to the main project expenses: 0.38% of total project cost, (a bag of salted peanuts in comparison!).
My opinion on this: I think for the time being, and given the financial crisis, it is much better to resort to the EDMUs that are similar to the UK’s Great Western Rail Class 802. These were designed to run on British railways which are not only of similar age and design but were actually built by British Engineers in the 1880s. Instead of reinventing the wheel, we can simply adopt it as a literal stop-gap solution until we have more money to electrify the ENR legacy mainline.
Besides, a great chunk of the ENR network will not be electrified anytime soon. Therefore, if the section between South Cairo/Helwan and Central Cairo proves to be of popular demand and electrification then becomes due, these EDMU units can still be deployed on many other sections across Egypt’s rail network, including from Ain ElSokhna to Suez, bridging HSR and ENR networks from the Eastern end of the line.
3- Build slip paths and branch-offs
Several slip paths and branches need to be built urgently to connect crucial infrastructure and provide real accessible and intermodal transport.
3-a- Borg ElARab airport slip path and train station.
Pictures 24 and 25: Maps of proposed Borg ElArab Airport - HSR Line 1 Rail-link (Source: Own work using Google Earth).
This is an obvious slip path and absolutely necessary.
Cost:
6.5 km of new rails = 4.5 million euros
1 new station (Between T1 and the new T2 passenger buildings at Borg ElArab International Airport): 1 million euros
Total: 5.5 million euros.
3b- Sphinx Airport branch off
While Smart Village and Abu Rawash Industrial area are a tad too far for a slip path, a branch off may do the job (to connect the airport, and possibly a light rail from airport to Smart village and Abu Rawash in the future) with a main train terminus station adjacent to the Sphinx Airport passenger terminal. It would connect HSR 1 with Sphinx Airport and allow for this mix of routes to take place:
Sphinx Airport - Central Cairo
Sphinx Airport - Borg ElArab airport - this would put these airports on the map of the budget airline transit industry, with passengers changing between airports using the HSR Line 1.
Sphinx Airport - West Alex
Sphinx Airport - North Coast and Matrouh
Sphinx Airport - New Cairo
Sphinx Airport - New Capital
Sphinx Airport - Ain Sokhna
Pictures 26 and 27: Maps of proposed Sphinx Airport - HSR Line 1 Rail-link (Source: Own work using Google Earth).
4- New Cairo First mile/Last mile?
Given the massive distance of the station from the city, and the social and economic importance of New Cairo, the only long term solution is to connect the HSR to New Cairo and its passenger volume potential, is by a rail branch off.
However, some form of LRT or Sbahn-styletrain connecting the Mohamed Naguib station to New Cairo’s different districts can help establish the mobility demand at a lower budget, and that would financially support a future branch off into New Cairo.
Pictures 28 and 29: Maps of proposed Mohamed Nagiub to New Cairo ‘sbahn’ link / future HSR branch (Source: Own work using Google Earth).
This may be true at Ain ElSokhna too: Where an LRT or coastal suburban line can help connect the small towns and resorts along the shore to the station.
Conclusion
The logic of these suggestions and ideas proposed here revolves around 5 key concepts:
1- Accessiblity and Intermodality:
If we want as many people as possible to benefit from the service and pay for HSR (to cover the costs and make net revenue), we need to make it as accessible and intermodal as possible. You need to reduce the number of changes at important stops (such as airports, metro/monorail/major bus stations, and terminals) by having direct connections to them. A bus from the HSR station to the nearest airport or metro station just won’t cut it for many people. Also, people traveling with luggage do not want to change more than a handful of times if ever.
2- Prioritize service to Urban areas:
Major urban agglomerations must always have their own train stops, and depending on their location and Population size, they must also be served by all types of trains (express, regional, and suburban). People living in well-established urban areas are less likely to drive to a stop more than 2 km away from the urban core. This is especially the case if the total journey time on existing trains eventually adds up to the same journey time expected, leading to no savings in time or fuel/trip costs.
3- Encourage Transit oriented development:
Whenever possible, if we have a stop next to empty undeveloped land, we should encourage the building of transit-oriented developments. These will become very much-needed and sought-after Housing units and will make maximum use of the existing railway and its adjacent services.
4- Closing the gap between the legacy and HSR systems:
In places where there is a phased transition or the construction of new railway systems, there must be a goal to close the gap between the two systems by finding ways to integrate them. This is particularly true between the HSR and ENR systems. If they both become integrated, it increases the resiliency of both systems and will help with the electrification of all the non-HSR railways, making it easier to provide new route combinations and have fewer transfers and modal changes due to the gap between electrified and non-electrified train routes.
5- Stations aren’t the end of the journeys:
If a station is not within a dense urban agglomeration, LRT or suburban rail services can help connect the station with its neighboring towns or villages.
I would even argue that in the medium and long run, it is in the interest of Siemens and DB to build these extensions and branches. In their paper, Belal et. al (2020) included a very important piece of advice to DB and Siemens:
“There is no doubt that the passenger flow (PF) on HSR is a crucial factor shown on ticket revenue. It has a direct impact on the total income of the project. Therefore, it has a significant role in project feasibility.” (page 1006)
As people in Egypt start getting to know the HSR network, folks regularly traveling between Cairo and Alexandria, for example, may begin to prefer traveling via the HSR network, if they know that they can get on an express train in Cairo Central and get to Alexandria or Borg ElArab Airport in one go, and much faster than they were used to traveling on the legacy line, that would make the HSR network a game changer of mobility in Egypt; and perhaps also benefit DB on the long run too.
Links:
The SUbMonitor turned 4 today!
The SUbMonitor's Unofficial Amman BRT map!
After trying out and navigating the Amman BRT system myself, I noticed there are no official Schematic maps showing the BRT's stops and directions. Therefore, I decided to put my skills in use and make an unofficial map for Amman's BRT system!
If you have any questions or feedback, please leave a comment or send us a message.
In the coming weeks, there will be a follow up post talking about my experience on the Amman BRT, my thoughts on it and recommendations for the future.
P.S: I would like to thank my dear friend and colleague, Hazem Zureiqat, for his insights and for his tips on how to navigate the BRT system as a new user. I thank him a lot for his advice and also recommend that you have a look at his article on this topic: (in Arabic) https://www.7iber.com/environment-urban/making-bus-rapid-transit-work/ (in English) https://web.archive.org/web/20160630105729/http://www.venturemagazine.me/2016/06/making-brt-work/
Buseet, a promising mobility startup that got tossed under the (micro)bus of a giant competitor, or a textbook example of gross fleet mismanagement?
Caption: Buseet had a lot of promising services, making it a comfier ride to a regular microbus. Credit: Buseet Egypt Instagram page.
Full disclosure: Several attempts were made to reach out to Amr ElSawy - CEO of Buseet Egypt - through various channels of communication. At some point, we even agreed to have a zoom chat after last Eid. However Eid came and went by without any response or concrete answer from ElSawy.
Not wanting to keep this story away from the readers’ eyes for too long, I have decided to move ahead and publish this article, and will post an update if ElSawy or any representative on his behalf sends in a comment or statement in response to this article.
Writing about public transport projects in Egypt is not particularly a happy task. On many occasions one feels the need to applaud the fact that a metro or high speed rail is being built in cities dominated by car traffic. However, the devil lies in the details and the little fine print on where the stations are placed and intermodal integration etc.
However, writing this article about Buseet has been one of the most depressing acts of writing about transit and mobility in Egypt.
In 2016, after Buseet’s buses began to sprawl the city’s streets, many spectators particularly in the startup scene speculated that it would end up being one of the most promising startups in the MENA region. Now, according to multiple sources both in the transport and startups sectors, the CEO and founder Amr El-Sawy is preparing to dissolve the company and has already moved to Dubai on a new endeavor. As mentioned earlier, multiple attempts were made to seek comments or any statements from the former CEO Buseet, in vain.
Where did things go wrong?
Multiple sources, who asked their identities to be withheld, said that Buseet simply did not have enough passengers using their buses on a regular basis, which meant they could not cover the costs of their daily operations, despite the growing demand for the service Buseet provided.
One source, who was close to multiple employees and the founder of the company, said that Buseet had a high rate of running costs mainly because they neither owned their microbuses, nor did they actually hire full time drivers to operate them. Buseet’s business model relied on making use of existing tourist bus companies that were experiencing a slump of demand due to the decline of tourism following the events of January 25th 2011 and onwards, and outsourcing the operations to them.
While initially lucrative, this left them vulnerable to the fluctuations of market rates of microbus rentals, particularly that the Tourism industry in Egypt picked up and demand on tourist bus companies rose back up in 2018, jeopardizing Buseet’s operations.
Another factor that led to Buseet’s decline was the lack of fleet and human power to achieve a sufficient enough frequency that would then incentivize passengers to change their daily commuting habits, and pick Buseet as their daily commute. In addition, Buseet - despite not having a significant fleet - cast a wide web of routes across Greater Cairo, leading them to stretch their availability slim by having a very limited schedule, offering on many routes only 2 trips a day.
While Swvl - Buseet’s arch nemesis - had a gigantic fund, and therefore could afford to lose a ton loads of money while continuing to gain a consumer base, Buseet had not been able to raise more than 3.7 million USD in 6 rounds of funding (Crunchbase - a, n.D). Swvl on the other hand got 254 million USD in only 8 rounds of funding (Crunchbase - b, n.D). Such an amount is not insignificant, yet Buseet seems to have gone around spending the amount running empty microbuses that people did not have incentives to ride due to lack of flexible scheduling and frequency.
Caption: Mohamed Neamatalla’s post on Buseet’s facebook wall, thanking them for their qualitatively much better service and customer service than Swvl, its main competitor.
Credit: Mohamed Neamatalla - Facebook, 2020.
The lack of a reliable fleet, coupled with an overambitious yet under-staffed network of routes, led to few passengers picking up rides with Buseet, despite it providing a qualitatively better service than its main competitor, Swvl. For instance, Swvl prioritized more profitable journeys over less popular ones, leading them to sporadically canceling trips booked by customers and simply refunding them or giving them credit on their account. On the other hand, Buseet honored its routes, even if only there was 1 person per journey. That racked up the costs of operations and ate away at Buseet’s already fragile finances.
Caption: Screen shot of Buseet's instagram account January 25, 2017, showing a buseet route going from ElSherouk, Madinity, Rehab to Mohandiseen. Only two trips a day, one leaving ElSherouk heading to Mohandiseen in the morning, and another trip returning from Mohandiseen in the afternoon.
Credit: Buseet Egypt Instagram account - January 2017.
Ironically, honoring routes and journeys would have been the more sound policy in comparison to what Swvl does. However, Buseet did not have the money to keep these journeys going, nor did they consolidate their minimal fleet on a single route/a handful of routes to achieve maximum frequency and increase the ridership of their buses.
Having a somewhat expensive price per journey in comparison to a regular microbus, without the frequency of a regular microbus route might have been the most lethal element to Buseet’s operations. Consolidating its fleet operations on to 1 or 2 routes where no other competition operates and running a much more frequent service would have generated the ridership they needed to be able to not only stay afloat, but also gain a wider customer base that would support them and use their services in any future expansion of Buseet’s network.
Caption: A rare example of a Buseet route with more than 2 trips a day: Sheikh Zayed-6th of October city to Maadi. 6 trips a day. Focusing more fleet and service on such routes, and reducing costs by making sure the route overall covers its costs, by using revenue from crowded trips to cover costs of less crowded trips could have helped Buseet stay afloat.
Credit: Buseet Egypt Instagram account - January 2017.
Not to mention that Buseet banked on so called Business to Business (B2B) operations, which for a while brought in some desperately needed cash, up until COVID 19 hit and caused many of these companies to ask their employees to work from home, and therefore canceling their contracts with Buseet. Another element that is related and has had an impact on Buseet, is the lack of secure cash flow for the business, and having to chase client companies to pay their dues in time. That made Buseet always strapped for cash.
And while Swvl might have survived (for now) due to its unfathomable ability to fundraise and even having enlisted on the NASDAQ index (Wamda News 2022), Buseet lost this battle not only because it kept its eyes on the (unsustainable) operations of their main competitor, but also it put all its eggs in the basket of B2B operations, which got blown away by the COVID 19 pandemic.
The fatal blow was their inability to read the mobility situation of Greater Cairo, or learn from how regular microbus routes have actually managed to achieve such great success (in a much more hostile environment in comparison to what Buseet had on its side). Frequency and a wise fleet management could have been the saving grace of Buseet, but the lack of them thereof has led to their demise.
Unfortunately this is a shame and a great loss to the mobility mix of Greater Cairo. It seems like so far, CTA buses and the Microbus routes of Cairo will remain the most robust mode of transit to achieve the missing first mile and last mile links to the metro network, alongside some of Swvl’s and Uber’s vehicles. In fact, Swvl has been able to secure a contract with the Ministry of Transport, to provide “first mile/last mile” services to and from the planned Cairo BRT station (Zawya 2023). Will Swvl be able to survive and stay afloat in a sphere that is narrowing by the day, and consolidating into other mega startups like Uber? This is a question for another post.
Related links and sources:
Instagram. (n.d.). Buseet Egypt. https://www.instagram.com/buseeteg/
Facebook. (n.d.). Buseet. Buseet Egypt. https://www.facebook.com/buseeteg
Farid, D. (n.d.). Is Egypt finally ready for ride-sharing?. Wamda. https://www.wamda.com/memakersge/2017/04/egypt-finally-ready-for-ride-sharing
Crunchbase. Buseet - funding, financials, valuation & investors. Crunchbase. (n.d.-a). https://www.crunchbase.com/organization/buseet/company_financials
Crunchbase. SWVL - funding, financials, valuation & investors. Crunchbase. (n.d.-b). https://www.crunchbase.com/organization/swvl/company_financials
Wamda News. SWVL debuts on Nasdaq, sets initial offer price at $9.95 per share. Wamda. (2022, March 31). https://www.wamda.com/2022/03/swvl-debut-nasdaq-sets-initial-offer-price-10
Zawya. (2023, June 8). SWVL obtains 1st license in Egypt to operate Smart Transport. ZAWYA. https://www.zawya.com/en/economy/north-africa/swvl-obtains-1st-license-in-egypt-to-operate-smart-transport-fu42kl2s
Cairo Airports metro links: Can they, finally, be completed?
Credit: M. ElKhateeb 2020
Perhaps you’re wondering, “Did I just read the title correctly? What do you mean by ‘Cairo Airports’ (with an “s” at the end)?”. Well, friends and colleagues, Cairo is no longer served by a single commercial airline hub. Cairo now has -gasp- 3 civilian-use airports, not counting the airfields and private airstrips/training airports (such as the 6th of October city airport, etc). Officially, Greater Cairo has Cairo International Airport, Sphinx International Airport, and Capital (International?) Airport.
You might say, but Sphinx International Airport is in Giza Governorate, and the Capital Airport is at the farthest eastern edge of Cairo Governorate, bordering the edges of the Suez Governorate. That may be true. However, both airports are, in fact, at the very edges of Greater Cairo. The Greater Cairo region is a semi-official entity that includes the Cairo Governorate and parts of Giza, Qaluibia, ElSharkia Governorates, and the "new administrative capital". This isn’t only a classification used by researchers and urbanist nerds like myself, it is also classified as such according to the Egyptian Local Governance law (EGY-SIS n.d).
A little bit of background…
Today marks the three year anniversary since the Cairo Airport metrolink was officially cancelled by the NAT, National Authority for Tunnels (Habashi 2020). I already made a video about why Cairo Airport is so difficult to reach by public transport, and in it I mention the transport situation at Cairo Airport.
Yet three years after the Heliopolis-Airport extension has been cancelled, we find ourselves in an interesting situation. There are yet to be any updates regarding the Adly Mansour-Cairo Airport shuttle bus service (Habashi 2021), nor does Cairo Airport have a designated BRT station, as of writing these words (see figure 1). Had the project continued as planned, we could have already inaugurated the Cairo Airport metro station, particularly given how the 3rd Line (aka Green line) is almost complete.
Figure 1: Map published by the Egyptian Ministry of Transport, showing the proposed sections of the Cairo Ringroad Bus Rapid Transit (BRT) project. n.d
Not only is there no high frequency mode of public transport, other than some of the commuter services run by Cairo Transport Authority (CTA), we also have two new airports that are yet to have any public transport connected directly to their terminals or within their premises.
So, how did we get here?
Sphinx Airport was a response to the need to have a western air hub for Cairo and Giza, that could a) relieve Cairo Airport, particularly during peak tourist seasons, and b) actually serve the folks living on the west side of the Nile in Greater Cairo (Varley 2023). Cairo International Airport is 27 km away from Giza square and 74 km away from the 6th of October city by road.
Figure 2: Distance by road from Cairo International to Giza Square. Credit: Screenshot from Google Maps.
And, needless to say, the New Capital airport was built alongside what is known as the new administrative capital. So, yeah, Cairo now has 3 airports.This begs the question: Are these airports a) connected to the metro/lrt/rail network? b) can they be somehow connected directly to each other?
These two questions can be answered in two folds:
Yes, Cairo International and Sphinx International can very easily be connected to the metro network. In fact, Cairo Airport came very close to having its very own 3rd line metro station, until it was "put on hold" due to "cost considerations". Sigh.
And yes, Cairo International and Sphinx International once connected to the 3rd line metro, would have a direct high-density rail connection, making them a super air hub (that is much more doable and reasonable than the Gatwick-Heathrow link proposals - see Jay Foreman’s video here: https://youtu.be/KXmpdJO9UOc).
As for connecting the Capital airport to its sibling ports, it gets a little bit trickier. The Capital airport technically has its own station on the LRT line heading to the new administrative capital. However, the station is quite far from the airport terminal. Making it beyond walking distances for commuters and passengers.
Figure 3: Distance by road from Hossary Square - 6th of October city to Cairo International. Credit: Screenshot from Google Maps.
Yet, given that this area is yet to be densely populated and there is PLENTY of free and empty land around, it will be very easy to link up the airport to the station, perhaps even using a simple electric tram running along the street connecting the airport to the station.
This would mean however, that anyone transferring from Cairo International or Sphinx International would have to take the metro to Adly Mansour station, change there to the LRT, then get off at the Capital Airport train station and take the tram to the airport. Needless to say, this is still doable and perhaps even not as expensive as people might think.
What can be done?
For starters, the Heliopolis Metro station was built with the foresight that one day an airport connection will be extended out of the station. The original plan, though, included tunnelling under restricted areas and into Masaken Sheraton, making the plan pricey, leading to its unfortunate cancellation (Habashi 2020). However, if we amend this plan to find a much more direct route to the airport, with the possibility of turning a section of this track into an overground route, this will slash the costs and reduce the construction time by half at the very least. Not to mention that many local private construction companies such as Orascom, and public companies such as the Arab Contractors, have built up the experience to build overground metro links (having completed the overground sections of Line 3). Hence this will probably be a piece of cake for these companies.
Figure 4: Proposed low cost metro extension from Heliopolis to Cairo International Airport. Proposed route skips going through Masaken Sheraton, and instead follows along the old Airport road, terminating at Cairo Airport’s Airmall, right next to Terminal 1 and connecting to other terminals via the automated people mover. It also passes by the main Airport administrative buildings and Terminal 1-Hall4, hence providing metro access to hundreds if not thousands of employees and airline staff. Credit: Screenshot from Google Earth.
Figure 5: A map previously published by the National Authority for Tunnels (NAT), that includes a proposed detour into Masaken Sheraton, and terminating at the west side of Terminal 3. Credit: NAT 2017
As for the Sphinx airport, despite the massive distance from the Line 3 terminus at Rod ElFarag, the path from the metro station to the airport terminal is surprisingly easy and wide open. Quite literally. Since the most difficult part of making this section of this route has been completed, building through some of the densest parts of Imbaba, Giza, the proposed route from the station to the airport would simply use the embankment or the Rod Elfarag axis all the way to the airport. There would only be a need for a few bridges here and there, which we all know are built far too easily in Cairo. Basically, the path is literally calling for it to be used for the metro construction. It has minimal curves, and not that many intersections that could make any construction work expensive.
Also aside from some emergency platforms along the way, you don't need to build that many stations between the Rod ElFarag Station and the Sphinx airport, cutting the costs down even further!
Figure 6: Proposed low cost metro extension from Rod ElFarag to Sphinx Airport. Credit: Screenshot from Google Earth.
Do we really need the Airport metro-links?
The short answer is: Yes, of course!
What would be the benefit of such links? They would be huge! First, this would put Greater Cairo firmly in the airport transit industry, catching up to its sibling hubs in the Arab World/middle east such as Dubai and Doha. Second, they would also serve thousands of government and airline employees, including customs officers, airport staff, and other staff working in industries associated with the airport industry.
Figure 7: Platform at Airport Terminal 3 Red Line Dubai Metro station, Dubai International Airport, Dubai, UAE, for trains to Jebel Ali (since June 2015 UAE Exchange) station, on 4 April 2012. Credit: Cornelius Kibelka - Wikimedia Commons - URL https://commons.wikimedia.org/wiki/File:Metro_Dubai_%287069089103%29.jpg
These links would also actually help relieve Cairo airport by making Sphinx a sibling airport that can take up some of the extra charter and seasonal flights, while still giving the passengers the possibility to connect to other flights at the other airport much more easily.
Needless to say, they would also boost all kinds of transit tourism and one-day tourism, of folks who were either domestically visiting other parts of Egypt like Sharm ElSheikh or Aswan, and instead of just connecting through Cairo for their flights, they can also make use of any layover time to visit the city, pass by the Grand Egyptian museum or the Giza pyramids (both of which will very soon have their very own metro stations on line 4), or simply visit downtown Cairo for its urban and food attractions etc.
Building these extensions would provide some of the remaining missing links Cairo has in its overall multi-modal transport plan and would, with a very limited construction plan, put Cairo back firmly into the urban tourism list and provide tourists, visitors, and residents alike a transit alternative that would help them move around during Cairo's everlasting traffic rush hours without the frustrations of being stuck in Taxi on the 6th of October bridge, anxiously hoping they will make it to their flight in time.
And in all cases, before anyone jumps at me saying "But what about taxis and limousines going to the airport?" To them I say there will always be tourists and visitors who must take a taxi because they are a) a family, b) have heavy luggage, c) have the time, want to avoid the metro crowds, and can afford to take an uber/taxi/limousine to the airport. In fact, with an increased number of passengers, and with Cairo's airports being more attractive for all kinds of airlines, the number of folks who will use Uber/taxis and limousines will rise, because there will simply be higher capacities in at the airports leading to more folks coming into town and dropping by for a visit.
Figure 8: Cairo International Airport, Terminal 3 at the shuttle bus stop. Credit: Alensha - Wikimedia Commons - URL: https://commons.wikimedia.org/wiki/File:Cairo_Airport_Terminal_3.jpg
References
Government of Egypt State Information Service (EGY-SIS). (n.d.). Local Administration (in Egypt). State Information Service. https://www.sis.gov.eg/section/275/2565?lang=en-us
Habashi, R. (2020, July 8). National Authority for Tunnels cancels Cairo Airport Metro extension, replaces with a “shuttle bus.” Youm7.com. https://www.youm7.com/story/2020/7/8/%D8%A7%D9%84%D9%82%D9%88%D9%85%D9%8A%D8%A9-%D9%84%D9%84%D8%A3%D9%86%D9%81%D8%A7%D9%82-%D8%AA%D9%82%D8%B1%D8%B1-%D8%A5%D9%84%D8%BA%D8%A7%D8%A1-%D9%88%D8%B5%D9%84%D8%A9-%D9%85%D8%AA%D8%B1%D9%88-%D9%85%D8%B7%D8%A7%D8%B1-%D8%A7%D9%84%D9%82%D8%A7%D9%87%D8%B1%D8%A9-%D9%88%D8%AA%D8%B3%D8%AA%D8%A8%D8%AF%D9%84%D9%87-%D8%A8%D9%80/4866381
Habashi, R. (2021, March 8). Plans to operate eBuses between Adly Mansour and Cairo Airport. Dedicated 3 km path to connect Cairo airport with NAT LRT. At cost of 280 mil USD. Youm7.com. https://www.youm7.com/story/2021/3/8/%D8%AE%D8%B7%D8%B7-%D8%AA%D8%B4%D8%BA%D9%8A%D9%84-%D8%AE%D8%B7-%D8%A3%D8%AA%D9%88%D8%A8%D9%8A%D8%B3%D8%A7%D8%AA-%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A6%D9%8A%D8%A9-%D8%AA%D8%B1%D8%A8%D8%B7-%D9%85%D8%AD%D8%B7%D8%A9-%D9%85%D8%AA%D8%B1%D9%88-%D8%B9%D8%AF%D9%84%D9%89-%D9%85%D9%86%D8%B5%D9%88%D8%B1/5236430
Varley, L. (2023, May 29). Flynas to launch direct flights to Sphinx International Airport. AviationSource News. https://aviationsourcenews.com/airline/flynas-to-launch-direct-flights-to-sphinx-international-airport/
TUMI 2023 Report. Feminist voices in Transport: Transport planning is not gender neutral!
It was such an honor to be invited to the latest iteration of the Transformative Urban Mobility Initiative’s (TUMI) “Women Mobilize Women” conference held at the Leipziger Kongresshalle on May 23rd, 2023. For the first time after the COVID-19 pandemic, I did have the chance to meet up once again with my colleagues and friends in the field of Sustainable Mobility and to get to meet new colleagues from all over the globe.
Out of dozens if not hundreds of international conferences tackling the issues of Sustainable Mobility and the related aspects of urbanity, TUMI’s conference provides a rare opportunity to meet Women leaders and researchers in the field of mobility. It also provides a much-needed platform for like-minded folks and supporters of making the case for gender-sensitive mobility solutions and research, especially in the post-COVID-19 world.
To reiterate the words of Christine Toetzke, the director general for the departments of Asia; South Eastern and Eastern Europe; Middle East, and Latin America at the German Ministry for International Cooperation (BMZ), we need to keep on restating the case for “why we need feminist voices for gender transformative planning”. We need to, according to Toetzke, try to explain all over again why feminism is important, particularly to urban transport and city planners. It is important we are committed to enabling all people to participate in all facets of life regardless of gender/clan/race and so on.
Christine Toetzke - director general for the departments of Asia; South Eastern and Eastern Europe; Middle East and Latin America at the German Ministry for International Cooperation (BMZ) - speaking during the Confernece.
These words and sentiments were not exclusive to Toetzke, but in fact, were a shared sentiment across the board. Robin Chase, co-founder of Zipcar and Tucows, about her story as a mum in the US, having to figure out a way to have access to mobility despite the sprawl and lack of public transport, leading to the establishment of Zipcar. Her startup led the way for other startups such as Blabla Car and other care-sharing startups across the world.
This was shared by the other panelists, including Yasmine Al Moghrabi who shared her own personal experiences with regard to road safety and the loss of life that we seem to have normalized car crash and collisions casualties, and deaths on the road. This then shifted the focus onto the contributions of Cyrpine Odada - the executive director of Critical Mass Nairobi, Kenya - and Keisha Mayuga - the director of AltMobility, Philippines - which focused on encouraging and making active mobility modes such as cycling safe and accessible to all. Odada specifically talked about her efforts promoting safe cycling by forming “bike trains” or gathering points and routes where cyclists can cycle together in shuttles to work/school etc and make use of their numbers to make their daily cycling commute safe for all of its participants.
Afterward, Andrea San Gil Leon - from the Global Network for Popular Transportation, Costa Rica - talked about breaking the mold of the so-called “informal transit” or “para-transit”, which their core are terms that carry an inherent amount of shaming and euro-centric (if not colonial) projection over modes of transport that have thrived and worked for decades, providing the communities they serve with essential and reliable mobility, albeit not fancy-looking or potentially comfortable as other modes of mass transit. San Gil Leon calls for replacing the word informal with a much more honest and representative term, Popular transport.
As the name suggests, these are modes of transit that may not fit in the so-called “official” transit, such as Government runs buses or trams/metro, etc. However, they do, honestly, represent what kind of transit it is: a popular mode that communities have come to rely on, especially women and other people who have caretaking.
Such popular transport services, while they may form profound obstacles to the traditional gender insensitive planning (aka gender neutral planning), they in fact fill a needed gap in the absence of formal, regulated services for women and other marginalized groups.
Later that day, one of the breakout sessions “Importance of Gender Responsiveness for Climate and Social Resilience in Transport” focused on how climate change increases the vulnerability of transport and mobility systems. Such new challenges posed higher risks and greater burdens on women and marginalized groups across the world. A discussion and group brainstorming took place examining the linkages between gender, transport, climate change adaptation, and socioeconomic resilience of transport systems.
One of the most profound keynote speeches of the day was Senator Crystal Asige’s words on the multiple layers of disadvantages facing BIPOC (Black, Indigenous, People of Color) with disabilities, particularly women with disabilities. Speaking of her very own experience of navigating the public space both in Kenya, the UK, and elsewhere while black and having glaucoma. Her words helped shed light on the intersectionalities of disability and gender and were an inspiration for the closing panel, which included speakers like Dr. Amani Abou-Zeid from the African Union Commission, Chiara Corazza - the French Representative of G20 EMPOWER initiative and a member of the G7 Gender Equality Advisory Council, Maruxa Cardama from the SLOCAT partnership on Sustainable Low Carbon Transport, Emmanuel John a Sustainable Urban Mobility Expert from Nigeria and CEO of Ochenuel Mobility, and Sonai Shah - founder of the Urban Catalysts and the executive director of C-SEC (Center for Sustainable and Equitable Cities).
Senator Crystal Asige from Kenya, during her keynote speech.
In the last panel discussion, the aforementioned wo/men leaders and experts of mobility spoke about the way forward and how to implement and finance Gender-Transformative measures in the Urban Transport sector. Dr. Abou-Zeid particularly spoke about Africa and the potential African nations have in leapfrogging and working out a more sustainable urban mobility reality in African cities and metropolises.
At the end of the day, Mary Crass - the head of Institutional Relations and summit at the International Transport Forum (at the OECD) - summarized some of the main findings from the “Women mobilize women 2023” conference. She stressed the importance of continuing to work together, grounding our reports in reality, the need to dig a little deeper into the OECD findings report, and announced that a gender toolkit is now online and available for experts and other stakeholders in the field.
Caption of photo above: "Let's fight for equality AND have some cake!" The organizers of the conference brought in cake for all the participants in celebration of TUMI's "Women Mobilize Women" initiative’s anniversary.
Caption of Photo below: Screenshot of the Global Network for Popular Transport website.
Main highlight: “Popular Transport” instead of “Informal Transport”.
Andrea San Gil Leon from the Global Network for Popular Transportation introduced a concept to the conference that I think is - from my personal experience of someone growing up in the Global South - essential and overlooked despite its importance and salience. San Gil Leon proposes that as researchers, leaders, and experts we should refrain from the word “informal” when describing non-government-owned modes of transport in the Global South such as Service cars, Microbuses, Tuktuks, and rickshaws. Instead, a more honest term that does not carry the same negative connotation would be “popular transport”. These modes of transit might suffer from a lot of issues and in some cases may be problematic in certain cities. However, they are only so, because of how they have been approached, studied, and in most cases made illegal or placed in a legal gray zone with the aim of removing them off the streets without necessarily providing any genuine reliable alternatives.
Approaching individual-owned and operated modes of public transport as a “popular” transport helps with its regulation, its development, and its integration into the modal split of systems. It also takes into account the households and families that rely on income-based from the operation of such vehicles, either directly as the families of the drivers/owners, the feeding industries of repair and maintenance, and those who rely on such popular transit to go to work, schools, markets and access government and social services.
For more information on this concept, and on the work of the Global Network for Popular Transportation, visit their website: https://www.populartransport.net/
Photo Description: Screenshot of a twitter post showing 2 trucks/SUVs parked on a side walk along with a green lime e-scooter, somewhere in the United States. The twitter user @MattRuscigno comments (in a sarcastic tone): “So tired of these scooters blocking sidewalks). Also visible in the photo is a wide road with a parked row of cars next to the sidewalk.
One of the most annoying bad takes in the field of transit is the hyperfocus on how bad e-scooters are in terms of how they often end up blocking sidewalks. While it is true that, especially in the beginning, a lot of e-Scooters littered the sidewalks and were a cause of public nuisance, and in some cases outright dangerous for people with disabilities. However, as the e-scooters apps get better at preventing such sidewalk littering, by forcing the user to take a photo of where they parked their e-scooter, the discussion that is not actually taking place is why scooters block sidewalks. Why are sidewalks so narrow that a single scooter can, and often does, effectively block a sidewalk, particularly for wheelchair users? Why don’t we say the same about massive SUVs and trucks parking on part or all of the sidewalk? In my opinion, it boils down to normalizing giving the vast majority of the street or avenue space to cars, pushing pedestrians, cyclists, and scooter users to the edges of these roads. In fact, not only do cars end up taking the bulk of the road, they end up competing with the other streets users by parking right next to the narrow sidewalk (forming a hard border between the road and users) and at times parking on a section of the sidewalk, making it much harder for the rest of the people to navigate and use the sidewalks.
Source of twitter post: https://twitter.com/MattRuscigno/status/1661833236467830784
The (mighty) bus stop.
Like many things we overlook, the humble bus stop just around the corner from where you live might have a much mightier role than one might think. The role of bus stops, and specifically their infrastructure (if any), is usually underappreciated by many planners and residents alike. However, having a good bus stop can have a significant impact on the uptake of public transport by daily commuters. But what is a good bus stop?
On the superficial level, there is the actual look of the stop. The waiting area or bus shelter must be distinct and identifiable from other street furniture or sidewalk paving. It must stand out visually, and preferably also have facilities to aid people with visual impairments to find their way to the cusp of the bus stop, or “the platform”. Just like a train’s platform, the side of the bus stop facing buses must have some distinction or elevation to allow safe and easy embarkment/disembarkment by passengers.
The stop must have some sort of protection against the elements and bad weather, and a bench or chairs for waiting passengers. It should also have the basic amount of Passenger information: A) the name of the stop, B) the number and direction/Terminus of the route, C) an illustration or list of upcoming bus stops and a timetable, D) a map of the network, and preferable a map of the area near the stop, E) Fare and ticketing information, and F) information on how to contact the transit agency or retrieve more information online, etc.
Here are two examples of bus stops: 1) the bus stop Vogesenstraße in Freiburg, Germany. While the bus stop lacks a shelter and a sitting area, it does check the mark on all of the other aspects, including a timetable and a map of the network. The lack of shelter or seats could be to reduce the chances of loitering and damage by graffiti since this is a small bus stop on a side street with a bus route that runs once an hour.
The assumption here is that people who need to use the bus will “know” when to head to the bus stop, and will not wait at the actual stop except for a few moments. This bus stop serves a low-frequency route (a variation of Line number 14) and while it provides a vital link to the central station (in the other direction/not visible in the photo), links to other parts of the city and the other more frequent modes of transit (such as the Tram), it remains an underutilized facility and many residents around here own private modes of transport (mostly bicycles, which is great of course, but also a lot of people own cars here too. Far too much, actually).
2) The second bus stop is a slightly busier stop called “Eschholstraße”, albeit serving essentially the same bus route. The two variations of Line 14, including the variation where the bus detours and goes to Vogessenstraße and other stops, stop here. The bus stop has a bus shelter, chairs, an information ticker giving real-time updates regarding the bus, information about the timetable, tariff zones, and a map of the network are also available.
The bus stop is linked by a short sidewalk and a traffic light crossing to the nearby tram stop with the same name.
The tram stop is serviced by 4 tram lines with frequent service, which reaches up to a tram every 5 minutes during peak hours.
In the design of the bus route, the assumption might have been that residents can walk to the nearest tram stop (around 7 to 10 minutes walk), use their own modes of transit, or just plan ahead if they want to use the bus. The argument here isn’t that this bus stop particularly needs more services, but that how frequently the bus drives by has had an impact on neighborhood bus stops such as Vogessenstraße. Waiting for a bus that comes around only once or twice every hour will make fewer people want to rely on this service, which in turn would keep the number of passengers low and insinuate/and act as confirmation bias to planners that nobody wants to use this bus shelter and or stop, and hence maybe they should cut back services even more to save money and redirect the funds elsewhere. This is called repressed demand for mobility. It’s all the trips that could have been taken by bus, but are now car rides. There are a lot of people who walk and cycle here, yet ignoring the needs of other users is ableist, and makes the case for a significant number of families living here to think of having at least one car shared among them.
لقاء مع الباحث أحمد طارق الأحول بخصوص الدراجات الهوائية (العجل) في مصر
شكر جزيل للأحمد ومشروع "وصلة" لمشاركتهم في الحوار، لمزيد من المعلومات عن مشروع "وصلة" يمكنكم زيارة صفحتهم على الفسيبوك على الرابط:
https://www.facebook.com/waslaprojectegypt
ولمزيد من الفيديوهات والمقالات بخصوص قطاع النقل في مصر يمكنكم الإشتراك في القناة ومتابعة صفحتنا على الفيسبوك https://www.facebook.com/thesubmonitor كما يمكنكم ايضا زيارة موقعنا على الرابط: https://thesubmonitor.com
ويمكنكم التواصل معنا عن طريق صفحتنا على الفيسبوك او عن طريق البريد الإلكتروني [email protected]
شكرا لمتابعتكم لقناتنا وصفحتنا ولا تنسوى الضغط زر "اعجبني" اذا اعجبكم الفيديو وترك تعليق اسفل الفيديو اذا كان لديكم اي مقترحات أو افكار بخصوص ما ورد في الفيديو.
قائمة مصادر الروابط والصور الواردة في الفيديو: Bossa Antigua by Kevin MacLead Link: https://incompetech.filmmusic.io/song... License: https://filmmusic.io/standard-License
Cairo tactical urbanism 2018 222 views 15 Apr 2019 https://www.youtube.com/watch?v=s8dJs...
إنشاء مسارات للدراجات بشوارع وسط البلد بعرض 1.70 متر.. تبدأ بشوارع محمد فريد وطلعت حرب وقصر النيل ومصطفى كامل و26 يوليو بطول 2 كيلومتر.. تنفيذ 30 محطة للدراجات بتكلفة 30 مليون جنيه ضمن مشروع "بسكلته" الخميس، 14 نوفمبر 2019 07:30 م كتب سيد الخلفاوى https://www.youm7.com/Article/NewsPri...
Tabdeel تبديل November 22, 2018 https://www.facebook.com/tabdeel4/pho...
Tabdeel تبديل June 18, 2020 الأولوية للمشاة... https://www.facebook.com/tabdeel4/pho...
مصر جميلة بالعجلة - الجزء الثانى 1,230 views 25 May 2020 https://www.youtube.com/watch?v=2FToZ...
UNDP Egypt - Shibin El Kom Bicycle lanes https://www.facebook.com/UNDPEgypt/ph...
Uploader., Public domain, via Wikimedia Commons https://commons.wikimedia.org/wiki/Fi...
Barrylb, Public domain, via Wikimedia Commons https://commons.wikimedia.org/wiki/Fi...
The role of advertisements in the marketing of gated communities as a new Western suburban lifestyle: a case study of the Greater Cairo Region, Egypt | SpringerLink https://link.springer.com/article/10....
Media Centre - Hyde Park https://www.hydeparkdevelopments.com/...
Transformative Urban Mobility Initiative (TUMI), CC BY-SA 4.0 https://creativecommons.org/licenses/..., via Wikimedia Commons https://commons.wikimedia.org/wiki/Fi...
موتوسيكل صيني بحاله ممتازة 150سي سي الماتور مفيهوش اي حاجه 2015 https://www.olx.com.eg/ad/150-2015-ID...
دراجة جديدة من٥ايام https://www.olx.com.eg/ad/-IDcwAGj.html
دراجة كهربائية26 للبيع https://www.olx.com.eg/ad/26-IDcxqAE....
مطالب بإنشاء خط سير بين أبنوب وأسيوط الجديدة.. وهذا تعليق المحافظ https://weladelbalad.com/2019/09/17/%...
The S-Bahn in Berlin: On the Way with the Bike, During Spring On the way with the S-Bahn: Train Station S-Bahn Charlottenburg, Enter with bike, In the train Editor: S-Bahn Berlin GmbH Author: J. Donath https://sbahn.berlin/en/about-us/pres... https://sbahn.berlin/en/about-us/pres...
الصفحة الرسمية لمترو القاهرة - الشركة المصرية لإدارة وتشغيل المترو https://www.facebook.com/CairoMetropa...
ITDP Africa: Cairo tactical urbanism 2018 https://youtu.be/s8dJsiVUnl0
Carfree cities alliance https://www.carfreealliance.org/