The Apollo 10 S-IC first stage arrives at KSC’s Vehicle Assembly Building (VAB).
Date: November 27, 1968
NASA ID: link
seen from China

seen from United States
seen from Paraguay
seen from United States
seen from United States
seen from United States
seen from United States
seen from Philippines
seen from United States

seen from Malaysia
seen from United Kingdom
seen from United States
seen from United States

seen from United States

seen from India
seen from China
seen from Jordan
seen from United States

seen from United States
seen from United States
The Apollo 10 S-IC first stage arrives at KSC’s Vehicle Assembly Building (VAB).
Date: November 27, 1968
NASA ID: link
"View of the Saturn V S-IC-5 (first) flight stage static test firing at the S-IC-B1 test stand at the Mississippi Test Facility (MTF), Bay St. Louis, Mississippi. Begirning operations in 1966, the MTF has two test stands, a dual-position structure for running the S-IC stage at full throttle, and two separate stands for the S-II (Saturn V third) stage. It became the focus of the static test firing program. The completed S-IC stage was shipped from Michoud Assembly Facility (MAF) to the MTF. The stage was then installed into the 407-foot-high test stand for the static firing tests before shipment to the Kennedy Space Center for final assembly of the Saturn V vehicle. The MTF was renamed to the National Space Technology Laboratory (NSTL) in 1974 and later to the Stennis Space Center (SSC) in May 1988."
Date: August 1, 1967
NASA ID: 6758560
"The first stage (S-IC) of the Apollo 10 Saturn V (SA-505) space vehicle is hoisted above the transfer aisle in preparation for erection on a mobile launcher within High Bay 2 of the Vehicle Assembly Building (VAB). The erection of the 138-foot-long stage marked the first use of mobile launcher 3 and high bay 2. Apollo 10 will be piloted by astronauts Thomas Stafford, John Young and Eugene Cernan. In the foreground are the mated command, service and lunar modules, the latter enclosed within the adapter, for the Apollo 9 (CSM-104/LM-3) flight of James McDivitt, David Scott and Russel Schweickart."
Date: December 5, 1968
NASA ID: S69-15690, KSC-68P-0575
"Artist's drawing illustrating a cutaway view of the Command and Service Modules of the Apollo 10 lunar orbit mission. Arrows point to various components and features of the CSM."
Date: May 19, 1969
NASA ID: S69-34072
"Prelaunch - Apollo 10 (rollout)
Aerial view at Launch Complex 39, Kennedy Space Center, showing a close-up of the 363-feet tall Apollo 10 (Spacecraft 106/Lunar Module 4/Saturn 505) space vehicle on its way to Pad B. The Saturn V stack and its mobile launch tower are atop a huge crawler-transporter. The Apollo 10 flight is scheduled as a lunar orbit mission. The Apollo 10 crew will be astronauts Thomas P. Stafford, commander; John W. Young, command module pilot; and Eugene A. Cernan, lunar module pilot."
Date: March 11, 1969
NASA ID: S69-27915, S69-27916, S69-27741
Arrival of the Saturn V S-IC (SA-505) stage for the Apollo 10 mission being lifted in the transfer aisle of the Vehicle Assembly Building (VAB), Kennedy Space Center. Teams lift the stage by crane in preparation for stacking on the mobile launcher 3 in high bay 2. It was transported via barge from the Michoud Assembly Facility in New Orleans, Louisiana.
In the background, are the mated command, service and lunar modules, the latter enclosed within the adapter, for the Apollo 9 (CSM-104/LM-3), and Facilities Verification Spacecraft (M-11).
Note: this first use of mobile launcher 3 and high bay 2.
Date: December 3, 1968
NASA ID: S68-55034, KSC-68C-7912, link