soli
[soliloquy id=ā775ā³]
View On WordPress
𩵠avery cochrane š©µ
todays bird

ellievsbear
noise dept.
Lint Roller? I Barely Know Her

gracie abrams
No title available
Color Me Curious
Doug Jones
Aqua Utopiaļ½ęµ·ć®åŗć§čØę¶ćē“”ć
Xuebing Du

Kiana Khansmith

oozey mess

⣠Chile in a Photography ā£
Fai_Ryy

titsay

Origami Around
Game of Thrones Daily
almost home
PUT YOUR BEARD IN MY MOUTH

seen from Malaysia

seen from United States

seen from Venezuela

seen from United States

seen from United States

seen from Malaysia

seen from United States
seen from Venezuela

seen from Iraq

seen from Cape Verde

seen from United Kingdom
seen from Malaysia

seen from United States

seen from United States
seen from United States
seen from United States
seen from United States
seen from United States

seen from Malaysia
seen from United States
@capolin-blog
soli
[soliloquy id=ā775ā³]
View On WordPress
1223
first post
View On WordPress
11
View On WordPress
aasas
aada
View On WordPress
qwqwqwq
qqwewew
View On WordPress
1234
122132342
View On WordPress
Test1234
12234test
View On WordPress
Functions of HVAC in HealthcareĀ Facilities Unlike non-critical facilities HVAC has a vital role in the day to day operation of any healthcare facility.
Staircase Pressurisation Fan Testing and Commissioning
Staircase Pressurisation Fan Testing andĀ Commissioning
Ensure that the pressurization fan installation is complete and mechanical completion is approved.
Ensure that vibration isolators are complete with proper alignment of fan.
Ensure that no damage occurs between mechanical completion and pre commissioning.
Ensure that orientation of the fans is as per approved shop drawings.
Repair all damages to the equipment finish paint if any.
Check theā¦
View On WordPress
Sanitary Ware Testing
Ensure that the Sanitary wares installation is completed and mechanical completion is approved
Ensure that no damage occurs between mechanical completion and pre commissioning.
Check the sanitary wares coordinated with architectural design.
Check the wash basin, shower point, WC, Hand spray, paper holder, etc. as per Design location.
Make sure that the Floor drain point is installed andā¦
View On WordPress
RMU Testing
Only authorized personnel will be allowed to enter the sub stations and LV rooms during testing.
The test areas will be demarcated with warning tapes and barriers will be erected to restrict movement of irrelevant personnel
Limited access permit will be issued for the specific test area valid for one day during normal working hours.
The equipment under test will be completely isolated andā¦
View On WordPress
OAHU Commissioning
Ensure that the OAHU is complete and mechanical works completion is approved.
Sealing between the access panels and the frames shall be checked to ensure that there is no leakage of air. Ensure that the AHU chamber is locked and fan outlet is temporary covered with suitable protection.
Repair all damages to the equipment finish paint.
Check OAHU installed as per the approved shop drawings andā¦
View On WordPress
Earth Electrode Resistance Measurement Using Dedicated Earth Electrode Tester
Earth Electrode Resistance Measurement Using Dedicated Earth ElectrodeĀ Tester
A proprietary Earth Electrode test device should be used.
Auxiliary Earth spikes should be applied at least 15 m apart and 15 m distant from the Earth Electrode under test.
An Earth resistance value of less than 10 ohms is required for a Locally Earthed System.
An additional number of Earth Electrodes may be required (or deeper electrodes) to achieve the required Earth resistance value.
Dueā¦
View On WordPress
Light Fixture Testing and Commissioning
Light Fixture Testing andĀ Commissioning
Ensure that the Light Fittings installation is complete and mechanical completion is approved & all comments on the installation ITRs are incorporated.
Ensure that no damage has occurred between mechanical completions & pre-commissioning.
Ensure the installation is in line with the approved False Ceiling layout & manufacturerās recommendations.
Ensure that all accessories such as lamp, fuses,ā¦
View On WordPress
Indoor Lux Level Test
Indoor Lux LevelĀ Test
Measurement of lighting levels is a major part of the building commissioning process. Measurement and processing of lux levels need special attention of the commissioning professionals. Sample points of measurement must be clearly defined and marked. Calculation of results must be accurate and interpreted correctly. Ā This section will cover various types of measuring devices, calibrationā¦
View On WordPress
IPTV System Commissioning
Verify the physical connectivity by checking LEDs in the servers. All LED should be linking
Check if all equipment installed can be seen
Connect to devices in the assigned VLAN at MDF and at IDF level to verify connectivity
Connect to devices in the room in assigned VLAN to test the connectivity.
Use Video LAN software to test multicasting across network
Check all the channels are present to theā¦
View On WordPress
GRP Water Tank Testing
GRP Water TankĀ Testing
Ensure that the tanks installation is completed and mechanical works are approved.
Ensure that no damage occurs between mechanical completion and pre commissioning.
Check the tank panel arrangement.
Check that the Relevant Piping is completed with valve accessories.
Make sure that the Gasket is properly fixed for all the Tanks assembly
Check the Ladder installation as per manufacturerā¦
View On WordPress