The $87 Billion Silence (Boeing 737 MAX)
It was raining on a construction site in Devanahalli, and I was standing over rebar doing a reinforcement and shuttering check before I could sign off quality for the client. A warehouse foundation. 57 cubic metres of concrete each. Four scheduled that day. The batching plant was already calling ā trucks loaded, every idle minute costing someone money that wasnāt mine to worry about but somehowā¦











