High-performance artistic textured concrete, textured formwork is a kind of formwork used to produce high-performance concrete textured panels with special texture and texture on the surface, which can be used to make a variety of different styles of concrete textured panels. Mechanical spraying, on the other hand, is a common method for producing high-performance concrete textured panels, which has the advantages of high production efficiency, simple process and low construction cost.
The following are the steps for producing precast high-performance concrete texture panels and installing panels by laying texture formwork and mechanical spraying process:
1. Preparation of textured formwork: select suitable Lai Lai formwork and place it on the production line.
2. Concrete Preparation: Mix the concrete raw materials according to the concrete proportioning requirements and formulate the high performance concrete that meets the requirements.
3. Application of release agent: evenly apply special release agent on the surface of Lai Lai formwork to ensure that the product is released from the mold.
4. Mechanical spraying: The Laili formwork coated with binder is mechanically sprayed with spraying machine to form the texture and grain of the concrete slab.
5. Reinforcement and Maintenance: Reinforce the surface of the concrete slab to ensure the firmness of the surface and prevent the surface from cracking.
6. Cutting and molding: Cut the concrete textured slabs into the required specifications and shapes.
7. Packing and Transportation: Pack the concrete texture slabs and transport them to the construction site.
8. Installation and fixing: Install the concrete textured panels on the building surface and fix them with a special fixing system.
It should be noted that in the production process of precast high-performance concrete veneer panels, raw materials, construction technology, construction environment and so on must be strictly controlled to ensure the quality and service life of concrete veneer panels. At the same time, special attention needs to be paid to the safety of the installation process to ensure the safety of construction personnel.
#Doubtful earth texture board