What started out as an aesthetic decision to frog back the salmon sheep to eliminate the extra white row when the chart repeated, turned into a frustratingly epic foray into repairing multiple issues.
I had to learn how to thread in an afterthought lifeline to safely frog back about 8 hours of work to reknit the grey sheeps where a surprise dropped stitch was discovered. Then I needed another lifeline to frog back half those sheeps again when I discovered a surprise extra stitches around had appeared. Also ended up downsizing the cable as the colourwork was being stretched too much whilst knitting.
In total, all of that, plus an extra row of sheep equated to about 14 hours of work.







