Virginia Mason Medical Center
During the build-out of Level 5 at Virginia Mason's Seattle campus, deflection and flatness issues on the concrete slab were identified by Turner Construction, the GC on the project. The project team decided to deal with these problems early in the construction schedule, and High Tech Cement's MB 10 along with ABW Construction's pump truck, were chosen to deal with the issue.
ABW pumped 50,000lb of MB 10 from outside the building, through the occupied hospital and onto the 5th floor without any interruption to hospital operations. MB 10's superior compressive strength and abrasive resistance, allowed the rest of the space to be built out and still leave a floor ready to install finished flooring with minimal prep.
Virginia Mason Medical Center, Seattle, WA
General Contractor:Â Turner Construction Company
Product: High Tech Cement MB 10 SLU